Retaining wall done in sanctuary cove
Built out of trend stone masonry block wall from Apex masonry.
Vertical steel Starter bars fixed every 400mm to catch each block then horizontal steel placed every second course for extra strength .
We then core filled with concrete and fixed the caps.
100mm Agi pipe was placed behind the wall then 20mm drainage stone on top for extra drainage and 50mm drainage pipe was placed through the wall so any excess water can get away without putting pressure on the wall .