mitchellmarineconstructions

mitchellmarineconstructions Marine construction company

AtoN (aids to navigation ) Maintenance contract 2026 from south morton bay to Caloundra .- replace ladders   - ladder br...
23/04/2026

AtoN (aids to navigation ) Maintenance contract 2026 from south morton bay to Caloundra .
- replace ladders
- ladder brackets
- denso jackets down below low tide
- pile colour bands
- all fixings
- extract and replace 2 new piles
Extremely tough conditions for all , thank-you for your efforts and contribution in all areas .
Very much appreciated in a challenging environment πŸ™ŒβœŒοΈ

Cement Australia emergency works . - 3 piles extracted extracted hooked up by divers - 3 new 20m timber piles installed ...
14/02/2025

Cement Australia emergency works .
- 3 piles extracted extracted hooked up by divers
- 3 new 20m timber piles installed
- 7 timber pile checkouts
- 2 new headstocks installed

TANGALOOMA PILING
31/10/2024

TANGALOOMA PILING

Proud to be apart of this beauty .. 2 lane boat ramp , demo rebuild 5 lane boat ramp demo rebuild 190 meter concrete cap...
20/09/2024

Proud to be apart of this beauty ..
2 lane boat ramp , demo rebuild
5 lane boat ramp demo rebuild
190 meter concrete capping beam
Sheet pile box cofferdam
Thanks for a brilliant project ..

- sheet pile box cofferdam - new 2 lane boat ramp - concrete capping beam - storm water pits installation . Thanks team
19/01/2024

- sheet pile box cofferdam
- new 2 lane boat ramp
- concrete capping beam
- storm water pits installation .
Thanks team

Brisbane lead light relocation.Client : Port of Brisbsne / MSQ - removal of 4 lead light structures - installation of 4 ...
28/12/2023

Brisbane lead light relocation.
Client : Port of Brisbsne / MSQ
- removal of 4 lead light structures
- installation of 4 new steel piles , 36 meters long
- supply and installation of all materials , aluminium platforms , beacons , SS ladders and brackets , denso wrapping..
- Brilliant project , tight programme and deadlines met .. Great job team .. Thanks to all contractors involved.

Merry Christmas to ALL our staff ,clients ,subcontractors and families who have supported us over 2022. Thank you for yo...
24/12/2022

Merry Christmas to ALL our staff ,clients ,subcontractors and families who have supported us over 2022. Thank you for your continued assistance & support throughout the year & making it a busy but memorable one. Enjoy your family and friends over the coming holidays and we’re looking forward to 2023 !! Cheers to 2022πŸ₯‚ πŸŽ„πŸŽ… πŸ”¨ πŸ’™ πŸ›₯

Thanks Morton diving πŸ€™ 🀿 legends ..
29/06/2022

Thanks Morton diving πŸ€™ 🀿 legends ..

Proud of this one.. - a gum tree fell on the gangways on the 1st Jan 2022, quoted to replace 2. The flood came through i...
07/06/2022

Proud of this one..
- a gum tree fell on the gangways on the 1st Jan 2022, quoted to replace 2.
The flood came through in the end of Feb 2022.
Lost pontoon , gangways , piles and boat ..
Replaced the entire jetty , less than 3 months after the floods ..
first full replacement on the brisbane river since the Feb floods .
Awesome clients , thanks for trusting us πŸ˜Šβš“οΈπŸ€™πŸ™
We met the 50th birthday party deadline also πŸŽ‰
Thanks to pacfic pontoon for the fabrication on a quick turnaround..

SeaWorld project complete. Installed a new barrier in the seal pool so they can swim all day long whilst the shows are s...
07/06/2022

SeaWorld project complete.
Installed a new barrier in the seal pool so they can swim all day long whilst the shows are still on .
-mobilised a barge crane and piling hammer into the pool with a 130 tonne crane
-installed 15 x FRP piles 10 meters long
-installed 50 frp panels with divers.
- great job , managed to secure a few new employees also !!
Thanks to superior jetties for getting us on board for this one πŸ€™ 🦭 βš“οΈ

Safe access project 2021.- installed two x 18 meter steel piles - demolished existing structure- lifted in the new steel...
20/12/2021

Safe access project 2021.
- installed two x 18 meter steel piles
- demolished existing structure
- lifted in the new steel frame for the safe access stairs
- removed existing dolphin units x 5
- installed 5 new dolphin units and supplied marine plant to assist in welding it off .
Thanks for getting us on board for the marine works. In and out in 2 weeks , was a great job , crew & outcome βš“οΈπŸ‘Œ

Address

Gold Coast, QLD

Alerts

Be the first to know and let us send you an email when mitchellmarineconstructions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to mitchellmarineconstructions:

Share