06/05/2026
Project Park Lane.
Not every project is a full cosmetic transformation.
Sometimes the most important work is the work you’ll never actually see.
AMOC COMPANY was engaged through body corporate for structural rectification works at Park Lane, Hope Island, after multiple water ingress issues caused structural failures throughout the external façade system of this 9-year-old building.
This project involved:
• Structural rectification works
• Installation of new structural posts and LVLs
• Removal and replacement of failed cladding
• Waterproofing and flashing rectification
• Temporary propping and structural support works
• Painting and reinstatement works
• Bringing the building back to Australian Standard compliance
From the outside, the property may look much the same as before — but behind the cladding is now a properly rectified structure built to perform the way it always should have.
Rectification work isn’t glamorous. It’s detailed, messy, and often completely hidden once complete. But there’s something rewarding about restoring confidence in a building and giving owners peace of mind knowing the unseen work has been completed properly, safely, and to a higher standard than when it was originally constructed.
Proud of the team and trades involved in getting this one over the line.
AMOC COMPANY
Your Vision, Our Foundation.