20/08/2025
Another wallaroo marina wall install.
This one required pull down of the old retaining wall not built properly with a new wall to be installed.
Upgrade of stormwater system and main lines with Cade Angus plumbing and gas.
New power feed runs to pontoon and bay lights.
Supply and install of adbri masonry versa wall blocks.
Prague 400 x 400 shark nose capping stones.
Paving to landings and base area.
All on a concrete footing, rodded and core filled as should be.
A high attention to detail and a curved entry to large staircase set this one off.
If you can imagine it we can build it.