The plasterboard installation has been successfully completed; skirting must now be installedπŸ•πŸ›πŸšπŸ¨
23/08/2026

The plasterboard installation has been successfully completed; skirting must now be installedπŸ•πŸ›πŸšπŸ¨

The plasterboard installation has been successfully finalized       πŸ•πŸ§±πŸ£πŸ­
23/08/2026

The plasterboard installation has been successfully finalized πŸ•πŸ§±πŸ£πŸ­

The shower room demolition will be followed by waterproofing and the simultaneous installation of plasterboard πŸ•πŸ—πŸ‘πŸͺ     ...
23/08/2026

The shower room demolition will be followed by waterproofing and the simultaneous installation of plasterboard πŸ•πŸ—πŸ‘πŸͺ

Kitchen remodeling is scheduled to commence following the demolition and plasterboard installationπŸ—ΊπŸ–πŸ—
23/08/2026

Kitchen remodeling is scheduled to commence following the demolition and plasterboard installationπŸ—ΊπŸ–πŸ—

A perimeter fence will be installed in this vicinity in the near future
23/08/2026

A perimeter fence will be installed in this vicinity in the near future

The application of grout for these tiles around the renovated kitchen πŸ•πŸ§±πŸ£πŸ¬
23/08/2026

The application of grout for these tiles around the renovated kitchen πŸ•πŸ§±πŸ£πŸ¬

The towel rail and the steel basin cabinet have been successfully installed and are now operationalπŸ”¨βœ¨οΈπŸ—πŸŒŠ
23/08/2026

The towel rail and the steel basin cabinet have been successfully installed and are now operationalπŸ”¨βœ¨οΈπŸ—πŸŒŠ

The installation of the floating vanity and water basin has been successfully completed πŸ‘πŸŒŠπŸ”¨πŸͺš
22/08/2026

The installation of the floating vanity and water basin has been successfully completed πŸ‘πŸŒŠπŸ”¨πŸͺš

The installation of the shower floor drain is nearing completion, marking the final task for today πŸͺ„πŸ‘πŸ’§πŸŒŠ
22/08/2026

The installation of the shower floor drain is nearing completion, marking the final task for today πŸͺ„πŸ‘πŸ’§πŸŒŠ

Installation of the toilet, shower, and bathroom drainage pipes to the main pipe       πŸŒŠπŸ’§πŸ”¨πŸͺ’
22/08/2026

Installation of the toilet, shower, and bathroom drainage pipes to the main pipe πŸŒŠπŸ’§πŸ”¨πŸͺ’

Address

Melbourne, VIC
3021

Telephone

+61474213780

Website

Alerts

Be the first to know and let us send you an email when Mariscal Construction Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Mariscal Construction Limited:

Shortcuts

Featured

Share