24/04/2022
After recent rains this creek crossing had been severely gouged and completely impassable. Utilizing rocks sourced from the property and reusing the pipes, a new higher crossing was formed by placing large boulders on the outside and filling the middle with slightly smaller rocks then capping with soil for smooth vehicle access. this has created a high drainage crossing that will allow extra flow through the rocks when the two pipes reach maximum flow rates, while firmly holding it all together for when the creek floods again.