07/09/2026
A shared path project like this is rarely just a path.
Stage 2 of the Mundy Street shared path for City of Greater Bendigo runs from Railway through to Back Creek, and the scope goes well past surface work. The job includes 180m of new stormwater, 333m of kerb and channel in a mix of plain and bluestone to match Bendigo's existing streetscape, and two raised safety platforms connecting over 850m2 of footpaths across each road.
We’re proud of the finished product and learnt a lot of valuable lessons from building this contract.
http://www.mancivil.com.au/civil-infrastructure