19/05/2026
A lot of work went into this Reno over the last few months.
- Removal of all asbestos
- Two 140mm Merbau deckings replace
- New 140mm Merbau decking for down stairs
- Blackbutt timber ceiling under front porch
- New eaves all around house
- New Merbau Timber posts on balcony
- Replaced balcony balustrade
- Polly pool installed
- All new internal doors throughout house
- New fascia and gutter around the whole house
- Roof restoration, tiles repointed and painted.
- Fresh concrete driveway
- Timber pailing fence
- Bathroom, kitchen and painting are currently being finished off
- Hardwood floors are being sanded and polished this week