25/07/2026
It’s been a massive week on our Trigg CLT Haus. While we didn’t quite get the roof on, we’re stoked with what our team has achieved. A huge thanks to CLT guru Andreas for his guidance throughout the build.
The progress has been incredible, and we can’t wait to share the finished photos and videos with you soon.
BUILDER: Saltus Built
ARCHITECT: DWC Studio
STRUCTURAL ENGINEER: Studio West Structures
CLT: KLH Pacific
CLT FIXINGS: Rothoblaas Australia
PASSIVHAUS CONSULTANT: Energy Efficiency Perth RIGGING: Rigsafe Lifting Solutions
🎥 Dougie