20/08/2026
Sorted in just 48hrs.
Stage 1 of works. Strip and load out the existing asphalt, break out the 300mm concrete plinth. Remove the failing retaining wall. Remove HD concrete pad below.
Prep for new retaining.
180m3 concrete and 90m3 asphalt removed. Demobilised - Done!