09/09/2026
Wondering if that wall in your house is load-bearing? Here's what actually happens when we open up the roof to check.
We look at ceiling joists versus roof load, then bring in an engineer to calculate exactly what size beam and tie-downs are needed.
As builders, we build to spec, but the engineer's assessment is what makes it official. Budget-wise, expect anywhere from $10,000 to $30,000+ depending on whether new footings and steel posts are needed.
From there it's usually a two to three day build, but getting steel posts and footings in can add time and cost.
Structural beams are one of those jobs where the prep work matters more than the install itself.