05/12/2025
Ben Dobie
Another day of excavation.
This one is 75 meters of shared power and water trench in Cambridge.
We have to connect the storm water and Sewer once the
Tas Manufactured Housing house is delivered.
https://tasmanufacturedhousing.com.au/