On Top Solutions Pty Ltd On Top Solutions offer a premium quality electrical installation service targeting government and pr

Wishing you a safe and Merry Christmas, from On Top
22/12/2023

Wishing you a safe and Merry Christmas, from On Top

Sports field lighting installed and commissioned by On Top. This system utilises a DALI and Halytech controller to allow...
09/03/2023

Sports field lighting installed and commissioned by On Top. This system utilises a DALI and Halytech controller to allow clubs remote switching and dimming to desired Lux levels. This was programmed in house by On Top.

On Top have been selected to provide a total rewire and major design and construct reconfiguration of the 1950’s Zammit ...
31/08/2022

On Top have been selected to provide a total rewire and major design and construct reconfiguration of the 1950’s Zammit Smallgoods facility at Pendle hill with Wiley & Co,
Our scope includes:
- New pad mounted substation LV MSB 1500amp
- New external PFC + Active Harmonic Filtering unit
- Three new 630amp main distribution boards
- Seven new 250amp distribution boards
- New cable trays, submain cabling to above mentioned boards
- New sub-circuit cabling
- New lighting, power, and stainless-steel conduits
We have engaged Shelmerdine Electrical Consultants to complete the design portion of our works.
This project will start in September 2022 and run through till July 2023.

New Project at RAAF Richmond, Working with Baseline Projects on the refurbishment of the Officers Mess building. The wor...
03/08/2022

New Project at RAAF Richmond, Working with Baseline Projects on the refurbishment of the Officers Mess building. The works include new lighting, power, sub circuits and distribution boards to the common areas, accommodation units, kitchen and common ablutions. This brings our live projects on the Richmond base to four.

New project underway at RAAF Richmond, working with Duratec Australia to upgrade lighting, cabling and switchboards to n...
26/06/2022

New project underway at RAAF Richmond, working with Duratec Australia to upgrade lighting, cabling and switchboards to nine buildings across the base.
This project will run through till early 2023.
Scope involves: Lighting, power, main switchboards, distribution pillars, submains, and investigation works.

New project kicking off, working with SDL Projects. We will be providing the Electrical package for the construction of ...
14/05/2022

New project kicking off, working with SDL Projects. We will be providing the Electrical package for the construction of the new amenities, maintenance and scorers buildings.

29/04/2022
We have kicked off a project at Zammit Smallgoods with Wiley & Co, working on the Stage One Fire Remediation works. We a...
13/04/2022

We have kicked off a project at Zammit Smallgoods with Wiley & Co, working on the Stage One Fire Remediation works. We are providing the electrical and communications for the design and construct package.
We have engaged Shelmerdine Electrical Consultants to complete the design portion of our works and to provide advice in relation to the existing site substation and LV MSB.
We are particularly looking forward to this one, as both the head contractor and end user are long time clients of ours.

Project underway at RAAF Richmond, working with Duratec Australia to upgrade the 176 Squadron facilities for improvement...
30/03/2022

Project underway at RAAF Richmond, working with Duratec Australia to upgrade the 176 Squadron facilities for improvement of air delivery equipment handling, maintenance and storage.
This project will run through till late 2022 and is in three stages across three buildings.
Scope involves: Lighting, power, main switchboards, 1600amp LV switchboards, new submains, and pad mount substation modifications.

We have completed a project at Wellington Correctional Centre. Working with Baseline projects we delivered the post mous...
18/03/2022

We have completed a project at Wellington Correctional Centre. Working with Baseline projects we delivered the post mouse plague rectification works.
- Installed around 400 new vandal/tamper resistant light fittings
- Stripped out and re-cabled mouse damaged wiring
- New emergency lighting with tamper resistant covers
- New split system and cassette air conditioning
- New cool room and freezer mechanical units.
Thanks to our guys for working away from home, and to our subcontractor Matt from Mattard Group for completing the mechanical scope.

https://www.abc.net.au/news/2021-10-01/mouse-infested-wellington-correctional-facility-refurbishment/100507212

01/03/2022

SDL is growing and we are looking for the following immediate start positions to be filled:

- Project Manager
- Site Manager
- Project Engineer
- Site Engineer
- Leading Hand
- Skilled Labourer

If interested and feel that you can contribute to our team, please email your CV to [email protected]

Address

2/62 Turner Road Smeaton Grange
Smeaton Grange, NSW
2567

Opening Hours

Monday 8am - 3pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 2pm

Alerts

Be the first to know and let us send you an email when On Top Solutions Pty Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to On Top Solutions Pty Ltd:

Share

Category