27/05/2026
⚡️Electrical Upgrade Done Right 🔥
The team has successfully complied another mains upgrade. This one had a few pieces to the puzzle -
✅ New power pole so the overheads wouldn’t be in a pool exclusion zone
✅ New 3 phase meter panel on the new pole to adhere to QECM
✅ Nee aerial bundle cable to existing switchboard to save the clients freshly landscaped front yard
✅ Existing switchboard upgraded to halve all circuits with electric shock protection