29/07/2026
Another bathroom transformed! 🔥
This one was a complete rip-out and redo from the ground up. We stripped everything back, re-sheeted the walls, completed full waterproofing, under-screed and top-of-screed waterproofing, and made sure every tile was installed on the right substrate—not stuck over 30-year-old paint with the wrong fixings and stud adhesive.
Finished with clean corner details, perfectly set base tiles, and quality workmanship throughout.
Massive effort by the team to knock this one over in just 2 weeks. Proud of the result! 💪🏽
Renovation BeforeAndAfter TeamWork