AJP Constructions Award Winning Sydney Builder CLT Building Specialist Building for a Sustainable Future

Bellevue CLT Home.On this project, the CLT was not just structure. A lot of it stays exposed, so the set-out had to be r...
14/10/2026

Bellevue CLT Home.

On this project, the CLT was not just structure. A lot of it stays exposed, so the set-out had to be right from the start.

The package was coordinated around the finished spaces, including the entry, stair, hallway, void, rumpus ceiling and rooflight openings.

Our job was to carry that through on site, checking levels, openings, junctions and the exposed timber finish as the build came together.

From model to site to finished space.
-
Architect
Structural Engineer
CLT
Structural Fixings: rothoblaas.australia

CLT was developed to answer a practical question:Can modern buildings be delivered using a renewable structural system w...
07/10/2026

CLT was developed to answer a practical question:
Can modern buildings be delivered using a renewable structural system without compromising performance?

Cross-laminated timber is an engineered alternative to concrete and steel, designed for accuracy, scale, and repeatability.

We build with CLT because it changes the build process, not just the material.
Stronger planning upfront. Faster assembly on site. Less rework later.

-
Project: Bronte CLT Duplex
Architect:
Structural Engineer:
CLT:
Structural Fixings: .australia .international

Once the panel layout is resolved, we look at how the structure will actually be delivered, installed and perform on sit...
25/09/2026

Once the panel layout is resolved, we look at how the structure will actually be delivered, installed and perform on site.

Can every panel reach its final position?
What holds the structure during installation?
Where can water collect?
Which timber stays exposed?
Has the complete floor build-up been assessed?
Do the envelope and fire details work together?

Site logistics, temporary stability, moisture, exposed finishes, floor performance, envelope and fire all need to be considered before fabrication.

The more that is resolved before panel release, the fewer problems need solving on site.

The install might happen in days. The decisions behind it happen much earlier.

As a CLT specialist builder, we get involved early before panels are released for fabrication.We review connection desig...
23/09/2026

As a CLT specialist builder, we get involved early before panels are released for fabrication.

We review connection design, structural layout, major openings, service penetrations and where tolerances are absorbed between factory-cut CLT and site-built elements.

These decisions shape the panel design, factory cutting and installation sequence. Resolve them early, and CLT can move quickly and accurately on site.

18/09/2026

September at Bronte, so far...

We opened up our CLT Duplex for a private site tour with , talking through the structure, the planning behind it, and how early coordination helps CLT move faster on site.

Lots of good conversations, CLT up close, and a full site. Thanks to everyone who joined us.

Should we do more of these? 🤔

NEW BUILD ALERT!Here's where our newest project in Rose Bay is headed.Designed by : brick, timber, terrazzo floors, and ...
26/08/2026

NEW BUILD ALERT!

Here's where our newest project in Rose Bay is headed.

Designed by : brick, timber, terrazzo floors, and a ground floor living space that opens straight out to the garden.

Demo is done and we're building. 💪🏼

He's graduated from the toy hammer and he's already reading the plans.Meet the youngest (unofficial) member of the AJP t...
24/08/2026

He's graduated from the toy hammer and he's already reading the plans.

Meet the youngest (unofficial) member of the AJP team, doing his bit on the our new project in Rose Bay.

More about this job this week. 👀

21/08/2026

Happy to finally share the Bronte CLT Duplex install. 7 days from first lift to full dual occupancy structure.

Months of preparation behind 7 days of installation.

Architect: Durack Architects
Structural Engineer: SDA Structures
CLT: NeXTimber by Timberlink
Structural Fixings: Rothoblaas Australia

Before any panel gets lifted, the work is in the checking.Panel numbers, delivery order, crane access, fixing details, s...
06/07/2026

Before any panel gets lifted, the work is in the checking.

Panel numbers, delivery order, crane access, fixing details, set-out, and where each piece lands once it comes off the truck.

By the time the CLT arrives on site, a big part of the install has already been planned.

-
Project: Bronte CLT Duplex
Architect
Structural Engineer
CLT
Structural Fixings: .australia

We've been quiet on here, but not on site.Plenty of coordination between the site team, crane crew, engineers, and suppl...
03/07/2026

We've been quiet on here, but not on site.

Plenty of coordination between the site team, crane crew, engineers, and suppliers.

Day 1 of CLT going in at Bronte Duplex: panels on site, crane lifts in full swing, and the first walls standing by the end of the day.

Architect:
Structural Engineer:
CLT:
Structural Fixings: .australia

Address

Sydney, NSW
2067

Alerts

Be the first to know and let us send you an email when AJP Constructions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AJP Constructions:

Shortcuts

Share