18/08/2026
πβ‘οΈπ Should the National Construction Code go from 2,000 pages to 80?
That is what Shadow Housing Minister Andrew Bragg proposed at the National Press Club this month.
Structural, fire safety and basic health requirements would stay mandatory. Energy efficiency and accessibility provisions would become optional.
The reaction has been loud in both directions.
For it: the code has ballooned from 208 pages in 1988 to over 2,000 today. HIA says recent changes added around $33,000 to a new house. Most builders would agree it is too hard to navigate.
Against it: some of those provisions were written for a reason. The balcony waterproofing rules came after roughly $2 billion in rectification costs from leaking balconies. Any builder who has been through a defect claim knows the cheapest build is not always the cheapest outcome.
And here is the bit nobody is covering: NSW has its own requirements like BASIX sitting on top of the NCC. A federal cut does not automatically change what you have to do here.
We have written it up straight, both sides, no barracking. Plus what it would actually mean on your sites and what you should do right now.
Worth knowing: this is opposition policy, not law. Nothing changes on your jobs tomorrow.
π Read it here: https://www.cpdcentre.com.au/blog/bragg-ncc-overhaul-80-pages-nsw-builders
What do you reckon? Too much red tape, or are those rules there for a reason? π
Shadow Housing Minister Andrew Bragg wants to cut the National Construction Code from 2,000 pages to 80. Here is what was proposed, the arguments both ways, and what it would mean for NSW builders.