29/09/2026
The Wodonga TAFE Logic Innovation Precinct officially opened at the start of September, a great milestone for a project that CG&C Group Pty Ltd was proud to help bring to life.
A Group effort from start to finish:
Connex Engineering – Temporary works & er****on engineering
Connex Detailing – 3D modelling, coordination & workshop drawings for Precast & Steel
CPE construction – Steel fabrication
CGC Site Services – Site installation
From engineering, modelling & Shop Drawings, through fabrication and instalation on site, a great example of what we can deliver together as CG&C group.
Design team
Architects: ds architects
Main Engineer: Oblik Group (Formerly Creo Structures)
Builder: Joss Group