19/10/2026
Topped out in South Brisbane 🏙️⚡
The final slab is poured on our build. Our team has been busy installing all in-slab conduits and wiring units.
Down on the ground, the crew's been in the trench laying heavy-duty conduit and hauling in the consumer mains, from the street to the main switchboard.
Commercial, multi-residential or residential, we've got you covered across Brisbane. Link in bio.