27/08/2026
Steel Trestle Bridge Construction in Bangladesh | In-Water Platforms End-to-End EPC Solutions
Building in-water infrastructure demands more than equipment it demands fleet ownership, engineering discipline, and proven ex*****on under real river conditions. SIMEX Bangladesh delivered exactly that on the Kalni River, installing over 3,000 tons of steel in a single season.
Project Highlight: 3,000+ Tons of Steel Installed in One Season on the Kalni River, part of the Dhaka-Sylhet Highway Corridor, executed with a full in-house fleet and international engineering supervision.
• International Engineering Supervision On-Site
• Full Fleet Ownership — No Subcontracted Equipment
• Proven on Dhaka-Sylhet Highway Corridor
• End-to-End EPC Ex*****on for In-Water Platforms
From river crossings to marine infrastructure works, SIMEX Bangladesh brings the fleet, engineering expertise, and ex*****on capability that large-scale steel trestle bridge projects demand.
Contact us for project consultation
• +88 017 3333 1033
• +88 017 3333 1032