02/11/2026
⚡ Another 300 kW / 600 kWh Seamless BESS Project Successfully Completed!
Proud to share that another 300 kW / 600 kWh SAV BESS has been successfully installed, commissioned, and is now operational at a 100% export-oriented manufacturing company in Gazipur Chowrasta, specializing in the production of high-quality surgical gowns.
The project delivers seamless backup power to support reliable and uninterrupted manufacturing operations, helping the facility maintain productivity during grid interruptions.
🔋 System Capacity: 300 kW / 600 kWh
⚡ Application: Seamless Backup Power
🏭 Industry: Export-Oriented Surgical Gown Manufacturing
📍 Location: Gazipur Chowrasta, Bangladesh
Key SAV BESS features include:
• Seamless power backup with fast switching
• Advanced PCS with VSG technology
• Intelligent BMS & EMS monitoring
• Grid and solar charging capability
• Real-time system monitoring and data analysis
• Improved power reliability and operational continuity
This successful commissioning reflects SAV’s growing capability to deliver safe, reliable, and intelligent energy storage solutions for Bangladesh’s industrial sector.
Special thanks to the entire SAV Digital Power Technologies Ltd. team for the continuous technical support and teamwork throughout the project. 🔋⚡