23/10/2026
COLD-ROOM PANEL JOINTS MUST BE SEALED AS ONE SYSTEM
A cold-room enclosure depends on coordinated panel joints, cam-lock engagement, gaskets, corner profiles, wall-to-ceiling interfaces and continuous sealing. If the joint profile and sealing details are finalized separately, the project may face air leakage, thermal loss, moisture entry, misaligned panels or avoidable installation changes.
Fair Insulation Technology supports project-specific PU Sandwich Panel joint coordination by reviewing the application, approved dimensions, panel orientation, joint profiles, cam-lock arrangement, gasket continuity, corners, supports, access requirements and installation sequence before manufacturing and site work. Final panel construction, PU core, thickness, facing, joint profile, gaskets, trims, sealing, fixing and installation method must be verified against the approved design, manufacturer data and project requirements.
Key Benefits
βͺοΈ Cam-lock joints coordinated with the approved panel layout
βͺοΈ Gaskets and sealing continuity reviewed before preparation
βͺοΈ Wall-to-ceiling and corner interfaces considered together
βͺοΈ Panel alignment and installation sequence included in planning
βͺοΈ Manufacturing, supply, installation and technical coordination
Suitable Applications
Cold Rooms, Freezer Rooms, Chilled Storage Areas, Food-Processing Enclosures, Refrigerated Warehouses and other approved projects requiring insulated PU panel systems.
Share your application, dimensions, operating conditions and approved specification with FIT for technical consultation and quotation.
π +8801848-097661
π fairinsulationtechnology.com
π’ Corporate Office:
House-57, Road-02, Block-D, Ground Floor, Mirpur-12, Dhaka-1216
π Factory Address:
Bhabanipur, Ward-02, Kashempur, Gazipur City Corporation