ā§§. āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ āĻā§?
āĻ: āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ āĻšāϞ āĻāĻŽāύ āĻāĻāĻāĻŋ āϏā§āĻĨāĻžāĻĒāύāĻž āϝā§āĻāĻžāύ⧠āĻŦāĻŋāĻĻā§āϝā§ā§ āĻā§āϞā§āĻā§āĻ āϰā§āĻĒāĻžāύā§āϤāϰ, āĻŦāĻŋāϤāϰāĻŖ āĻŦāĻž āύāĻŋā§āύā§āϤā§āϰāĻŖ āĻāϰāĻž āĻšā§āĨ¤
⧍. āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ⧠āĻāϤ āĻĒā§āϰāĻāĻžāϰā§āϰ āĻā§āϰāĻžāύā§āϏāĻĢāϰāĻŽāĻžāϰ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšā§?
āĻ: āĻĒāĻžāĻā§āĻžāϰ āĻā§āϰāĻžāύā§āϏāĻĢāϰāĻŽāĻžāϰ āĻ āĻĄāĻŋāϏā§āĻā§āϰāĻŋāĻŦāĻŋāĻāĻļāύ āĻā§āϰāĻžāύā§āϏāĻĢāϰāĻŽāĻžāϰāĨ¤
ā§Š. āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ⧠āĻŽā§āϞāϤ āĻā§āĻāĻŋ āĻā§āϞā§āĻā§āĻ āϞā§āĻā§āϞ āĻĨāĻžāĻā§?
āĻ: āϏāĻžāϧāĻžāϰāĻŖāϤ ā§ŠāĻāĻŋ â HV, MV āĻ LVāĨ¤
ā§Ē. āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ⧠CT āĻ PT-āĻāϰ āĻāĻžāĻ āĻā§?
āĻ: CT (Current Transformer) āĻāĻžāϰā§āύā§āĻ āĻŽāĻžāĻĒā§, PT (Potential Transformer) āĻā§āϞā§āĻā§āĻ āĻŽāĻžāĻĒā§āĨ¤
ā§Ģ. āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ⧠āϞāĻžāĻāĻāύāĻŋāĻ āĻ
ā§āϝāĻžāϰā§āϏā§āĻāϰ āĻā§āύ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšā§?
āĻ: āĻŦāĻā§āϰāĻĒāĻžāϤ āĻŦāĻž āϏāĻžāϰā§āĻ āĻĨā§āĻā§ āϏāϰāĻā§āĻāĻžāĻŽ āϰāĻā§āώāĻž āĻāϰāϤā§āĨ¤
ā§Ŧ. PFI āĻĒā§āϞā§āϝāĻžāύā§āĻā§āϰ āĻāĻžāĻ āĻā§?
āĻ: Power Factor āĻāύā§āύā§āύ āĻāϰāĻžāĨ¤
ā§. RMU āĻā§?
āĻ: Ring Main Unit â 11kV āϞāĻžāĻāύ āϏā§āĻāĻāĻŋāĻ/āĻĄāĻŋāϏā§āĻā§āϰāĻŋāĻŦāĻŋāĻāĻļāύā§āϰ āĻāύā§āϝ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšā§āĨ¤
ā§Ž. VCB āĻŽāĻžāύ⧠āĻā§?
āĻ: Vacuum Circuit BreakerāĨ¤
⧝. SF6 āĻŦā§āϰā§āĻāĻžāϰā§āϰ āĻā§āϝāĻžāϏ āĻā§?
āĻ: āϏāĻžāϞāĻĢāĻžāϰ āĻšā§āĻā§āϏāĻžāĻĢā§āϞā§āϰāĻžāĻāĻĄ (SF6) â āĻāύā§āϏā§āϞā§āĻļāύ āĻ āĻāϰā§āĻ āĻā§āϝāĻŧā§āĻā§āĻāĻŋāĻ āĻāϰ āĻāύā§āϝāĨ¤
ā§§ā§Ļ. MCB āĻ MCCB āĻāϰ āĻĒāĻžāϰā§āĻĨāĻā§āϝ āĻā§?
āĻ: MCB āĻā§āĻ āĻāĻžāϰā§āύā§āĻā§āϰ āĻāύā§āϝ, MCCB āĻŦā§āĻļāĻŋ āĻāĻžāϰā§āύā§āĻ āĻ āϞā§āĻĄā§āϰ āĻāύā§āϝ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšā§āĨ¤
---
ā§§ā§§. āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ⧠Busbar āĻāϰ āĻā§āĻŽāĻŋāĻāĻž āĻā§?
āĻ: āϞā§āĻĄ āĻŦāĻŋāϤāϰāĻŖ āĻ āϏāĻāϝā§āĻā§āϰ āĻāύā§āϝāĨ¤
⧧⧍. OLTC āĻŽāĻžāύ⧠āĻā§?
āĻ: On Load Tap Changer â āĻāĻžāϞ⧠āĻ
āĻŦāϏā§āĻĨāĻžā§ āĻā§āϞā§āĻā§āĻ āύāĻŋā§āύā§āϤā§āϰāĻŖāĨ¤
ā§§ā§Š. Breaker-āĻāϰ Tripping Mechanism āĻā§āĻāĻžāĻŦā§ āĻāĻžāĻ āĻāϰā§?
āĻ: āĻāĻāĻžāϰāϞā§āĻĄ āĻŦāĻž āĻļāϰā§āĻ āϏāĻžāϰā§āĻāĻŋāĻ āĻšāϞ⧠āϰāĻŋāϞ⧠āϏāĻŋāĻāύā§āϝāĻžāϞ āĻĻāĻŋā§ā§ āĻŦā§āϰā§āĻāĻžāϰ āĻā§āϰāĻŋāĻĒ āĻāϰāĻžā§āĨ¤
ā§§ā§Ē. CT āϰā§āĻāĻŋāĻ āϞā§āĻāĻž āĻĨāĻžāĻā§ āϝā§āĻŽāύ: 100/5 â āĻāϰ āĻŽāĻžāύ⧠āĻā§?
āĻ: āĻĒā§āϰāĻžāĻāĻŽāĻžāϰāĻŋ āĻāĻžāϰā§āύā§āĻ 100A āĻšāϞ⧠āϏā§āĻā§āύā§āĻĄāĻžāϰāĻŋ āĻšāĻŦā§ 5AāĨ¤
ā§§ā§Ģ. āύāĻžāĻŽāĻŽāĻžāϤā§āϰ (Nominal) āĻā§āϞā§āĻā§āĻ āĻŽāĻžāύ⧠āĻā§?
āĻ: āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύā§āϰ āĻĄāĻŋāĻāĻžāĻāύāĻā§āϤ āĻāĻĻāϰā§āĻļ āĻā§āϞā§āĻā§āĻ āϞā§āĻā§āϞāĨ¤
ā§§ā§Ŧ. Breaker Trip Delay Time āĻŽāĻžāύ⧠āĻā§?
āĻ: āĻāĻāĻžāϰāĻāĻžāϰā§āύā§āĻā§āϰ āĻĒāϰ āĻāϤ āϏāĻŽā§ āĻĒāϰ⧠āĻŦā§āϰā§āĻāĻžāϰ āĻā§āϰāĻŋāĻĒ āĻāϰāĻŦā§āĨ¤
ā§§ā§. Earth Fault āĻā§?
āĻ: āĻā§āύ⧠āĻĢā§āĻ āϞāĻžāĻāύā§āϰ āϏāĻžāĻĨā§ āĻāϰā§āĻĨā§āϰ āϏāϰāĻžāϏāϰāĻŋ āϏāĻāϝā§āĻ āĻšāĻā§āĻžāĨ¤
ā§§ā§Ž. Substation earthing āĻāϤāĻāĻž āĻāĻā§āϰ āĻšāĻā§āĻž āĻāĻāĻŋāϤ?
āĻ: āϏāĻžāϧāĻžāϰāĻŖāϤ 10-15 āĻĢā§āĻ, āĻŽāĻžāĻāĻŋāϰ āĻā§āĻŖāĻžāĻā§āĻŖ āĻ
āύā§āϝāĻžā§ā§āĨ¤
⧧⧝. ACB āĻŽāĻžāύ⧠āĻā§?
āĻ: Air Circuit BreakerāĨ¤
⧍ā§Ļ. Substation Automation āĻŽāĻžāύ⧠āĻā§?
āĻ: āϰāĻŋāĻŽā§āĻ āĻāύā§āĻā§āϰā§āϞ āĻ āĻŽāύāĻŋāĻāϰāĻŋāĻ āϏāĻŋāϏā§āĻā§āĻŽāĨ¤
---
⧍⧧. ā§§ā§§/ā§Ļ.ā§Ē āĻā§āĻāĻŋ āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύ⧠CT āĻāϰ āϰā§āĻāĻŋāĻ āϏāĻžāϧāĻžāϰāĻŖāϤ āĻā§ āĻšā§?
āĻ: 200/5A, 400/5A āĻāϤā§āϝāĻžāĻĻāĻŋāĨ¤
⧍⧍. CT polarity āĻā§āύ āĻā§āϰā§āϤā§āĻŦāĻĒā§āϰā§āĻŖ?
āĻ: āϰāĻŋāϞ⧠āĻ āĻŽāĻŋāĻāĻžāϰāĻŋāĻ āϏāĻ āĻŋāĻāĻāĻžāĻŦā§ āĻāĻžāĻ āĻāϰāĻžāϰ āĻāύā§āϝāĨ¤
ā§¨ā§Š. HV āĻ LV āĻā§āĻāĻžāĻŦā§ āϏāĻāĻā§āĻāĻžā§āĻŋāϤ āĻšā§?
āĻ: HV > 33kV, LV ⤠1kVāĨ¤
⧍ā§Ē. Droop Fuse āĻā§ āĻāĻžāĻā§ āϞāĻžāĻā§?
āĻ: āϞāĻžāĻāύ⧠āĻļāϰā§āĻ āĻšāϞ⧠āύāĻŋāĻā§āĻ Fuse cut āĻāϰ⧠āĻĻā§ā§āĨ¤
⧍ā§Ģ. Substation āĻā§āϰāĻžāύā§āϏāĻĢāϰāĻŽāĻžāϰ⧠insulation test āĻā§āĻāĻžāĻŦā§ āĻšā§?
āĻ: Megger āĻĻāĻŋā§ā§ IR (Insulation Resistance) āĻŽāĻžāĻĒāĻž āĻšā§āĨ¤
⧍ā§Ŧ. Bus Coupler Breaker āĻā§āύ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšā§?
āĻ: āĻĻā§āĻāĻāĻŋ āĻŦāĻžāϏāĻŦāĻžāϰ āϏāĻāϝā§āĻā§āϤ āĻāϰāϤā§āĨ¤
⧍ā§. Ring Main Unit āĻāϰ āϏā§āĻŦāĻŋāϧāĻž āĻā§?
āĻ: āϰāĻŋāĻĄāĻžāύā§āĻĄā§āύā§āϏāĻŋ āĻ āϞā§āĻĄ āĻāĻžāĻ āĻāϰāĻžāϰ āϏā§āĻŦāĻŋāϧāĻžāĨ¤
ā§¨ā§Ž. Transformer oil test āĻā§āύ āĻāϰāĻž āĻšā§?
āĻ: āĻāύā§āϏā§āϞā§āĻļāύ āĻ
āĻŦāϏā§āĻĨāĻž āĻ āĻāϰā§āĻĻā§āϰāϤāĻž āĻĒāϰā§āĻā§āώāĻžāϰ āĻāύā§āϝāĨ¤
⧍⧝. Substation āĻ Battery Charger āĻāϰ āĻāĻžāĻ āĻā§?
āĻ: Protection relay āĻ breaker-āĻāϰ auxiliary supplyāĨ¤
ā§Šā§Ļ. Neutral grounding āύāĻž āĻāϰāϞ⧠āĻā§ āϏāĻŽāϏā§āϝāĻž āĻšā§?
āĻ: Earth fault āϏāĻ āĻŋāĻāĻāĻžāĻŦā§ āĻāĻžāĻ āĻāϰāĻŦā§ āύāĻž, āĻā§āϞā§āĻā§āĻ imbalance āĻšāĻŦā§āĨ¤
---
ā§Šā§§. ABB REJ601 āĻĄāĻŋāĻāĻžāĻāϏ āĻā§ āĻāĻžāĻā§ āϞāĻžāĻā§?
āĻ: Protection relay, āϝāĻž āĻā§āϰāĻžāύā§āϏāĻĢāϰāĻŽāĻžāϰ/āĻŦā§āϰā§āĻāĻžāϰ⧠āĻĢāϞā§āĻ āύāĻŋāϰā§āĻŖā§ āĻāϰā§āĨ¤
ā§Šā§¨. Fault Level āĻā§āĻāĻžāĻŦā§ āύāĻŋāϰā§āĻŖā§ āĻāϰāĻž āĻšā§?
āĻ: S.C. capacity = (V²/Z) āϏā§āϤā§āϰā§āĨ¤
ā§Šā§Š. Line Loss āĻāĻŋāĻāĻžāĻŦā§ āĻāĻŽāĻžāύ⧠āϝāĻžā§?
āĻ: Power Factor āĻāύā§āύā§āύ, āϏāĻ āĻŋāĻ conductor, āĻ āύāĻŋā§āĻŽāĻŋāϤ āϰāĻā§āώāĻŖāĻžāĻŦā§āĻā§āώāĻŖāĨ¤
ā§Šā§Ē. Substation layout design-āĻ āĻā§ āĻĨāĻžāĻā§?
āĻ: Transformer, HT panel, LT panel, PFI, Earth pit, RMU āĻāϤā§āϝāĻžāĻĻāĻŋāĨ¤
ā§Šā§Ģ. Transformer Tap Changing āĻāĻŋāĻāĻžāĻŦā§ āĻāĻžāĻ āĻāϰā§?
āĻ: āĻā§āϞā§āĻā§āĻ āϞā§āĻā§āϞ āύāĻŋā§āύā§āϤā§āϰāĻŖā§ āĻā§āϝāĻžāĻĒ position āĻĒāϰāĻŋāĻŦāϰā§āϤāύ āĻāϰā§āĨ¤
ā§Šā§Ŧ. Earth Resistance āĻāϤ āĻšāĻā§āĻž āĻāĻāĻŋāϤ?
āĻ: 1Ί āĻŦāĻž āϤāĻžāϰ āύāĻŋāĻā§ āĻāĻžāϞ⧠āϧāϰāĻž āĻšā§āĨ¤
ā§Šā§. Substation Automation System āĻā§āύ āϏāĻĢāĻāĻā§ā§āϝāĻžāϰ āĻĻāĻŋā§ā§ āĻāϰāĻž āĻšā§?
āĻ: SCADA, PLC, HMI āĻāϤā§āϝāĻžāĻĻāĻŋāĨ¤
ā§Šā§Ž. RTU āĻŽāĻžāύ⧠āĻā§?
āĻ: Remote Terminal Unit â āϏāĻžāĻŦ-āϏā§āĻā§āĻļāύā§āϰ āĻĄā§āĻāĻž SCADA-āϤ⧠āĻĒāĻžāĻ āĻžā§āĨ¤
ā§Šā§¯. Substation āĻāϰ āĻŦāĻŋāĻāĻŋāύā§āύ zone āĻā§ āĻā§?
āĻ: Incoming zone, Transformer zone, Protection zone, Metering zoneāĨ¤
ā§Ēā§Ļ. Substation commissioning āĻā§ āĻā§ āϧāĻžāĻĒā§ āĻšā§?
āĻ: Equipment test, connection test, IR test, polarity test, trial run
ā§Ēā§§. āĻāĻŋāĻāĻžāĻŦā§ VCB āĻ OCB āĻāϞāĻžāĻĻāĻž āĻšā§?
āĻ: VCB-āϤ⧠āĻāϰā§āĻ āύāĻŋāĻāĻļā§āώ āĻšā§ āĻā§āϝāĻžāĻā§ā§āĻžāĻŽā§, OCB-āϤ⧠āϤā§āϞ āĻŦā§āϝāĻŦāĻšā§āϤ āĻšā§āĨ¤
ā§Ē⧍. Substation-āĻ synchronizing relay āĻāϰ āĻāĻžāĻ āĻā§?
āĻ: āĻā§āϰāĻŋāĻĄ āĻ āĻā§āύāĻžāϰā§āĻāϰā§āϰ āĻā§āϞā§āĻā§āĻ āϏāĻžāĻŽāĻā§āĻāϏā§āϝ āϰā§āĻā§ āϏāĻāϝā§āĻ āĻāϰāĻžāĨ¤
ā§Ēā§Š. Relay Coordination āĻā§?
āĻ: āϏāĻ āĻŋāĻ āϏāĻŋāĻā§ā§ā§āύā§āϏ⧠āĻĒā§āϰā§āĻā§āĻāĻļāύ āϏāĻŋāϏā§āĻā§āĻŽ āĻāĻžāĻ āĻāϰāĻžāϰ āύāĻŋā§āĻŽāĨ¤
ā§Ēā§Ē. Harmonics āĻā§?
āĻ: āĻā§āϞā§āĻā§āĻ āĻŦāĻž āĻāĻžāϰā§āύā§āĻā§ āĻ
āĻŦāĻžāĻā§āĻāĻŋāϤ āĻĢā§āϰāĻŋāĻā§āϝāĻŧā§āύā§āϏāĻŋ āĻāĻĒāĻžāĻĻāĻžāύāĨ¤
ā§Ēā§Ģ. Arc Flash āĻā§?
āĻ: āĻļāϰā§āĻ āϏāĻžāϰā§āĻāĻŋāĻā§āϰ āϏāĻŽā§ āĻšāĻžāĻ āĻāύāĻžāϰā§āĻāĻŋ āϏā§āĻĒāĻžāϰā§āĻ āĻŦāĻž āĻāϰā§āĻ āĻā§āĻĒāύā§āύ āĻšāĻā§āĻžāĨ¤
ā§Ēā§Ŧ. NGR āĻŽāĻžāύ⧠āĻā§?
āĻ: Neutral Grounding ResistorāĨ¤
ā§Ēā§. Substation Panel-āĻāϰ Control Wiring āĻā§ āĻāĻžāĻā§ āϞāĻžāĻā§?
āĻ: Breaker, relay āĻ alarm system āύāĻŋā§āύā§āϤā§āϰāĻŖāĨ¤
ā§Ēā§Ž. Substation Fault Logging āĻā§āĻāĻžāĻŦā§ āĻšā§?
āĻ: Digital relay/SCADA āĻĨā§āĻā§ fault history āϰā§āĻāϰā§āĻĄ āĻāϰāĻž āĻšā§āĨ¤
ā§Ē⧝. Interlocking system āĻā§āύ āĻĻāϰāĻāĻžāϰ?
āĻ: āĻā§āϞ operation āĻĒā§āϰāϤāĻŋāϰā§āϧā§āĨ¤