Offsite CLT Construction

Offsite CLT Construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Offsite CLT Construction, Construction Company, Nassau.

Site visits in Eleuthera for an upcoming project đź’«
21/03/2022

Site visits in Eleuthera for an upcoming project đź’«

08/03/2022

Build Better, Stronger and Faster with OffSite CLT. The new Wendy’s Restaurant - located on Wulff and East St - was built in less than 1 month. CLT has a far superior strength-to-weight ratio than reinforced concrete making the panels suitable for walls, roofs and floors. Because the panels are prefabricated and assembled to size off site our construction site time is drastically reduced helping to keep costs down. This condensed site time also helps to decrease noise, waste and traffic impacts of construction activity. Get in touch today to learn more about Offsite CLT construction

Early impressions of the new Wendy’s Restaurant. Now complete with the familiar exterior finishes that conceal with CLT ...
01/03/2022

Early impressions of the new Wendy’s Restaurant. Now complete with the familiar exterior finishes that conceal with CLT build within, this structure is The Bahamas’ first carbon negative restaurant building.
This structure utilizes 3,4 and 5-ply pressure treated CLT panels giving the building a wind tolerance close to 200mph and a fire rating that far exceeds the minimum requirements of The Bahamas’ building code.

One of the biggest benefits of using CLT is that the structure can be built quickly and efficiently. Because panels are ...
12/11/2021

One of the biggest benefits of using CLT is that the structure can be built quickly and efficiently. Because panels are designed and prefabricated for specific end-use application, they are shipped to the job site where they can be promptly lifted into place. Wall, floor and roof elements can be pre cut, including openings for doors, windows, stairs, service channels and ducts. This greatly reduces site time and results in lower capital costs and faster occupancy. CLTs structural performance and cost competitiveness allow it to compete directly with concrete and steel. Demand worldwide continues to grow for efficient, cost-effective and building materials with proven performance and we are thrilled to help Bahamians use CLT for their building solutions!

Using mass timber as a structural material sequesters carbon and lowers overall emissions from a construction project. I...
11/11/2021

Using mass timber as a structural material sequesters carbon and lowers overall emissions from a construction project. It’s exciting to see a Bahamian company choosing this sustainable alternative for their business! We use only raw material harvested from certified, sustainably managed timberlands. Our pressure treated CLT panels are a high static efficiency, light and dynamic panel that allows for an optimized design. This is a constructive, modular system that is highly adaptable to each project whether it’s new construction or building restoration. Our panels can be used as both indoor and outdoor wall elements, ground joists and roof covers. The versatility of this system makes it ideal for the construction of single family homes, residential projects, offices, industrial buildings, modular buildings and buildings for public use.

The first pressure treated Cross Laminated Timber structure is underway! We are so excited to see this structure taking ...
10/11/2021

The first pressure treated Cross Laminated Timber structure is underway! We are so excited to see this structure taking shape on Bahamian soil! Concrete and steel have long been considered the two best materials for construction, but timber technologies have advanced beyond the capabilities of this combination. The panels are cut into sections and travel directly to the job site. The biggest element of cost savings associated with CLT is the remarkably short install timeline. Pictured above is the first series of panels being lifted and secured into it’s steel connectors. This technology makes the on-site construction schedule dramatically shorter, greatly reduces site noise and makes for minimal public disturbance no matter the scale. This project will be complete in a matter of weeks!

Address

Nassau

Website

Alerts

Be the first to know and let us send you an email when Offsite CLT Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share