06/16/2026
There's a lot going on here. The previous main panel couldn't handle the amount of solar we wanted to push back to the grid, so we installed a 225A busbar and kept the 100A main.
Ready to easily swap to 200A if the client ever upgrades the feeders to the meter and transformer. Until then, the load management device (bottom right) keeps his demand in check. A ~$1,400 solution that lets him add load without a service upgrade that can run anywhere between $10-$60k!
Own Your Power.