Calgary Framers

Call Directions Website

Calgary Framers Calgary's foundation-to-weather-tight framing contractor. Licensed. Insured. One crew, no gaps. πŸ“ž (587) 355-2799

"Free assessment" gets said a lot. Here's what it actually looks like when we do one.We walk the site β€” or the plans, if...
10/05/2026

"Free assessment" gets said a lot. Here's what it actually looks like when we do one.

We walk the site β€” or the plans, if it's new construction β€” and look at what the job actually requires, not just what's written down. For an addition or basement development, that means checking how the new framing needs to tie into the existing structure. For a new build, it means confirming the scope matches the drawings before pricing anything.

From there, you get a written, fixed-scope quote β€” not a verbal number, not a range that "depends." A real timeline, a real breakdown of what's included, and straight answers if something in the plan needs to change before work starts.

No pressure, no obligation. If the timing or the number isn't right for you, that's fine β€” you walk away with a real answer either way.

πŸ“ž (587) 355-2799

Stage 04: Weather-Tight. Round 2, closed out.Windows and doors in. House wrap sealed. Same arc as the first build we doc...
10/03/2026

Stage 04: Weather-Tight. Round 2, closed out.

Windows and doors in. House wrap sealed. Same arc as the first build we documented in August β€” floor, walls, roof, weather-tight β€” different job, same standard every time.

Two full builds documented start to finish now. If you've been following along since Stage 01 back in August, thank you β€” more of these coming as new projects break ground.

Licensed. Insured. One crew, foundation to weather-tight, every time.

πŸ“ž (587) 355-2799 Β· calgaryframers.ca

"Can I just move this wall?" β€” one of the most common questions homeowners ask before a renovation, and the honest answe...
10/02/2026

"Can I just move this wall?" β€” one of the most common questions homeowners ask before a renovation, and the honest answer is always "it depends."

It depends on whether it's load-bearing. It depends on what's routed through it β€” electrical, plumbing, HVAC ducting isn't always visible from the room. It depends on what's directly above it on the next floor or in the attic. And in some cases, it depends on permit requirements the city has for structural changes.

None of that means the wall can't move. It means someone needs to actually check before a sledgehammer answers the question for you.

This is the first in a running Q&A on renovation questions we hear a lot β€” drop yours in the comments and future ones might answer it directly.

Most people compare framing quotes purely on the bottom-line number. That's usually the wrong comparison.Two quotes for ...
09/29/2026

Most people compare framing quotes purely on the bottom-line number. That's usually the wrong comparison.

Two quotes for the same project can differ by thousands of dollars because of what's actually included β€” lumber grade, whether engineered joists or dimensional lumber are specified, whether cleanup and disposal are in scope, whether the timeline has any buffer for weather.

The lower number isn't always the better deal. Sometimes it's the same deal with things quietly left out.

The question worth asking isn't "why is this one more expensive" β€” it's "what does this one include that the other one doesn't." That's usually where the real answer is.

Free assessments here always come with a full breakdown, not just a total.

πŸ“ž (587) 355-2799

"Is this wall load-bearing?" is one of the most common questions we get, usually from someone mid-renovation who wants t...
09/28/2026

"Is this wall load-bearing?" is one of the most common questions we get, usually from someone mid-renovation who wants to knock something down.

A load-bearing wall carries structural weight from above β€” floors, roof, sometimes both β€” down to the foundation. Remove or alter one without proper support in place, and that weight has to go somewhere. Usually that "somewhere" shows up later as sagging floors, cracked drywall, or a door that suddenly won't close.

Not every interior wall is load-bearing. But guessing wrong is expensive to fix after the fact. If you're planning any renovation that involves removing a wall, get it checked before anything comes down β€” not after.

A question for anyone following along: what's the one thing you wish you'd known before hiring a contractor for the firs...
09/27/2026

A question for anyone following along: what's the one thing you wish you'd known before hiring a contractor for the first time?

We ask because it's usually the same handful of answers β€” get it in writing, ask for the WCB and insurance numbers directly, don't accept a verbal timeline. Small things that save a lot of stress later.

Drop yours below. Might turn the best ones into their own post β€” with credit, if you're up for it.

"Fixed-scope quote" sounds like contractor language. Here's what it actually means for you.A fixed-scope quote spells ou...
09/26/2026

"Fixed-scope quote" sounds like contractor language. Here's what it actually means for you.

A fixed-scope quote spells out exactly what's included β€” materials, labor, timeline β€” before a single board gets cut. If something outside that scope comes up (and on any real build, something occasionally does), it gets discussed and priced separately, in writing, before it becomes part of the job.

The alternative is an open-ended estimate that can quietly grow once work has already started β€” and by then, you're not really in a position to shop around.

It protects you because you know the number before you commit to it. It protects us because there's no ambiguity about what was agreed to.

Every quote we give is fixed-scope, free assessment included. Ask any contractor you're comparing whether theirs is too.

πŸ“ž (587) 355-2799

Stage 03: Roof Structure.Trusses set and braced, sheathing on. The shell stops being open to the weather from this point...
09/25/2026

Stage 03: Roof Structure.

Trusses set and braced, sheathing on. The shell stops being open to the weather from this point forward β€” one more stage and this one's weather-tight.

Stages 01 and 02 are up if you're catching this mid-series. Stage 04 closes it out next Friday.

Stage 02: Wall Framing.Exterior and interior walls sheathed, stood, and plumbed β€” shear walls nailed to schedule, same a...
09/24/2026

Stage 02: Wall Framing.

Exterior and interior walls sheathed, stood, and plumbed β€” shear walls nailed to schedule, same as every job. This is the point where the floor plan stops being lines on paper and starts being rooms you can actually walk through.

Stage 01 (floor system) is up if you missed it.
Stage 03 next Friday.

One of the most common questions we get: how long does framing actually take?For a standard single-family home, the fram...
09/23/2026

One of the most common questions we get: how long does framing actually take?

For a standard single-family home, the frame itself β€” floor, walls, roof structure β€” usually runs 2 to 4 weeks once materials are on site, weather permitting. Additions and basement development timelines vary more, since they depend on how much has to tie into the existing structure.

What throws off a timeline more than almost anything else: weather delays and material lead times on engineered lumber or trusses, which are often ordered weeks ahead.

A proper quote should give you a realistic range up front, not a best-case number that quietly slips once work starts.

Address

Calgary, AB

Opening Hours

Monday 7am - 7pm
Tuesday 7am - 7pm
Wednesday 7am - 7pm
Thursday 7am - 7pm
Friday 7am - 7pm
Saturday 7am - 7pm
Sunday 7am - 7pm

Telephone

+18254372224

Alerts

Be the first to know and let us send you an email when Calgary Framers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Sponsored

Share