06/02/2026
๐ข Calgary Rezoning Update
๐จ Key Dates ๐จ
Based on Development approvals timelines, applications received after the following dates will be reviewed based on their August 4, 2026 zoning decision.
๐ May 4, 2026: Rowhouse, Townhouse, Courtyard Development, Contextual Single Detached Dwelling, Single Detached Dwelling, Contextual Semi-detached Dwelling, Semi-detached Dwelling, Duplex Dwelling, and Discretionary Backyard Suites
๐ June 6, 2026: Standalone Secondary Suites, proposed relaxation(s), permitted Backyard Suites
๐ July 6, 2026: Permitted Secondary Suites (without relaxation)
Note: Applications submitted after these dates will have to either change their proposal or apply to rezone the property.
๐จ Approved changes to the R-CG zone that will apply to future developments after August 4, 2026:
โ Maximum height is lowered from 11m to 10m.
โ Maximum lot coverage is lowered from 60% to 55%.
โ Zero lot line developments are no longer allowed.
โ Rowhouses that meet all rules can be a permitted use in R-CG again, same as prior to the citywide rezoning in 2024.
๐จ Additional Changes might come in place in the coming weeks.
๐๏ธ How Tricor Design Group Can Help
At Tricor, we are already helping our clients adapt and move forward by:
โ Identifying the best zoning strategy (R-CG, M-CG, H-GO, or rezoning paths)
โ Fast-tracking DP submissions within the transition window
โ Designing projects that align with new bylaw limits and city expectations
โ Navigating approvals with strong planning rationale and experience
๐ก Bottom line:
Opportunities in Calgary are still strong โ they just require smarter strategy, faster action, and the right team.
If youโre planning a project or unsure how these changes affect your land, reach out to us โ weโre here to help you move forward with confidence.
โ Tricor Design Group