Coral Rock Construction PEI

Coral Rock Construction PEI Delivering affordable, high-quality homes across PEI — from skilled trades to full builds.

Another custom accessory building coming together. 🔨This project features durable vinyl siding paired with a modern meta...
05/25/2026

Another custom accessory building coming together. 🔨

This project features durable vinyl siding paired with a modern metal roof for a clean, low-maintenance finish built to handle PEI weather year-round.

At Coral Rock Construction we build and customize accessory buildings for almost any purpose:

• Storage sheds
• Garages
• Backyard suites
• Backyard offices
• Workshops
• Playhouses
• Garden buildings
• Hobby spaces

Every project is customized to fit your property, style, and needs — from simple utility buildings to fully finished spaces.

Serving all of Prince Edward Island

📩 Message us to start planning your project.

Another duplex project wrapped up for Edgar’s Construction 🔨Completed the exterior insulation installation and got the b...
05/15/2026

Another duplex project wrapped up for Edgar’s Construction 🔨

Completed the exterior insulation installation and got the building ready for waterproofing. Protecting the sheathing early is one of the most important parts of the build process — the sooner the structure is sealed and protected from moisture, the better the long-term performance of the home.

Great working alongside the Edgar’s Construction team on this new duplex build. Looking forward to seeing the final result come together.

🌲 Pine tongue & groove install completedThis space was transformed using natural pine — clean lines, tight joints, and a...
03/27/2026

🌲 Pine tongue & groove install completed

This space was transformed using natural pine — clean lines, tight joints, and a warm finish that completely changes the feel of the room.

There’s something different about real wood.
It brings a sense of calm, comfort, and connection to nature that you don’t get with synthetic materials.



🔨 Clean install
🌿 Natural finish
🏡 Built to last



Thinking about upgrading your space with natural materials?
📩 DM us for a quote

🏠🔨 Roofing Phase BeginsBig milestone on this build — we’re officially starting the roofing stage today.After completing ...
03/12/2026

🏠🔨 Roofing Phase Begins

Big milestone on this build — we’re officially starting the roofing stage today.

After completing the structural framing, installing the roof sheathing, and finishing the waterproofing, we’re now moving into the final step to close the structure: installing the shingles. This will fully seal the house and bring the project to a proper watertight finish.

It’s always satisfying to see a structure go from framing to a fully protected home. One step closer to completion.

More progress updates coming soon.

🏨 Another project wrapped up this week.Our crew completed a carpet installation at the Delta Hotel, including flooring w...
03/10/2026

🏨 Another project wrapped up this week.

Our crew completed a carpet installation at the Delta Hotel, including flooring work and the stairs. Always satisfying seeing everything come together clean and properly fitted.

Even smaller projects require attention to detail to make sure everything lines up properly and looks right in the space.

Good work by the team getting it done.

🏗️ Framing Stage CompleteWe’ve officially wrapped up the framing phase, including roof sheathing and waterproofing, brin...
03/10/2026

🏗️ Framing Stage Complete

We’ve officially wrapped up the framing phase, including roof sheathing and waterproofing, bringing this build very close to a fully closed shell.

Next up we’ll be installing the roof shingles, which will complete the exterior protection of the structure before the project takes a short pause.

It’s always exciting to see a project reach this stage — when the structure truly starts to feel like a home.

Great work by the team getting us to this milestone. More updates soon. 👷‍♂️

Delta Hotel Carpet Replacement ProjectWe recently completed a carpet replacement at the Delta Hotel after the existing f...
02/21/2026

Delta Hotel Carpet Replacement Project

We recently completed a carpet replacement at the Delta Hotel after the existing flooring was affected by deep stains that could not be removed through cleaning.

Our team removed the damaged carpet, prepared the surface, and installed new carpet to restore a clean, professional look for guests and staff. The refreshed flooring improves both appearance and cleanliness while maintaining the high standards expected in hospitality spaces.

If your commercial property needs flooring replacement or restoration, we’re ready to help.

Framing Progress Update 🏗️Over the past month we’ve made strong progress on this build. Roof trusses are fully installed...
02/21/2026

Framing Progress Update 🏗️

Over the past month we’ve made strong progress on this build. Roof trusses are fully installed, wall and roof sheathing are complete, and exterior insulation is underway as we prepare to close in the structure.

Our final goal before pausing work is to complete the waterproofing and weatherproofing, ensuring the home is protected before the rainy season begins. Once funding resumes, we’ll continue pushing toward the next phase.

Proud of the progress so far and excited for what’s ahead.

01/19/2026

🌿 Spring Decks, Pergolas & Landscaping Projects 🌿

Spring is the perfect time to upgrade your outdoor space. We design and build custom decks, pergolas, and complete landscaping solutions to fit your home, style, and budget.

✔️ Custom decks & stair systems
✔️ Pergolas & outdoor structures
✔️ Landscaping, grading & yard improvements
✔️ Quality materials & skilled workmanship
✔️ Free quotes & great prices

Whether you’re refreshing your backyard or starting from scratch, we’ll help bring your vision to life—on time and built to last.

📞 Book your free quote today
🌐 Coral Rock Construction
Licensed & insured

Delivering affordable, high-quality homes across PEI — from skilled trades to full builds.

Second Floor Framing – Next Steps 🏗️We’re moving into the next phase of the build with the second floor framing underway...
01/19/2026

Second Floor Framing – Next Steps 🏗️

We’re moving into the next phase of the build with the second floor framing underway. The exterior is partially sheathed, and the current focus is completing the rough framing—setting walls, tying the structure together, and preparing for roof trusses.

This stage allows us to finalize alignment and structural details before the remaining sheathing is completed. Once rough framing is finished, we’ll proceed with:
• Completing exterior wall sheathing
• Installing the weather barrier
• Waterproofing the building envelope

This sequence ensures everything is properly aligned and ready to be sealed tight for the next stages of construction.

Address

24 Gilbert Drive
Charlottetown, PE
C1C0W2

Opening Hours

Monday 9am - 8pm
Tuesday 9am - 8pm
Wednesday 9am - 8pm
Thursday 9am - 8pm
Friday 9am - 8pm
Saturday 9am - 8pm
Sunday 9am - 8pm

Alerts

Be the first to know and let us send you an email when Coral Rock Construction PEI posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share