Jakes Construction Ltd.

Call Directions Website

Jakes Construction Ltd. A name built on dependability
Capable | Resourceful | Committed
Trusted and comprehensive civil construction, serving British Columbia since 1993

A few faces from across our crews ๐ŸšงThere are a lot of people behind the work we do and weโ€™re proud of the crews out in t...
10/06/2026

A few faces from across our crews ๐Ÿšง

There are a lot of people behind the work we do and weโ€™re proud of the crews out in the field who help bring each project together.

We couldnโ€™t get everyone in front of the camera, but the appreciation goes to all of you. Thanks for the work you put in every day.

Work is underway along Highway 3 between Manning Park and Eastgate as our crews continue flood recovery work across seve...
09/24/2026

Work is underway along Highway 3 between Manning Park and Eastgate as our crews continue flood recovery work across several sites.

The project includes rebuilding and protecting embankments, working around drainage channels and waterways, and placing rip rap to help restore and strengthen areas impacted by flooding.

A good look at some of the work taking shape out there.

Hereโ€™s a look at the work recently completed at Copper Creek on Highway 3.The project included repairs to the roadway an...
09/15/2026

Hereโ€™s a look at the work recently completed at Copper Creek on Highway 3.

The project included repairs to the roadway and retaining wall, slope stabilization and new erosion-control measures below the highway. Crews also reinforced the affected area to help provide a more durable solution moving forward.

A lot of work went into this one, the before-and-after photos give a good look at the changes - from the initial site conditions to the completed work.

๐—” ๐—บ๐—ฎ๐—ท๐—ผ๐—ฟ ๐—บ๐—ถ๐—น๐—ฒ๐˜€๐˜๐—ผ๐—ป๐—ฒ ๐—ฎ๐˜ ๐—ฆ๐—ป๐—ฎ๐˜€๐˜€ ๐—–๐—ฟ๐—ฒ๐—ฒ๐—ธ.The temporary bridge has now been removed, and traffic is officially travelling over th...
09/04/2026

๐—” ๐—บ๐—ฎ๐—ท๐—ผ๐—ฟ ๐—บ๐—ถ๐—น๐—ฒ๐˜€๐˜๐—ผ๐—ป๐—ฒ ๐—ฎ๐˜ ๐—ฆ๐—ป๐—ฎ๐˜€๐˜€ ๐—–๐—ฟ๐—ฒ๐—ฒ๐—ธ.

The temporary bridge has now been removed, and traffic is officially travelling over the permanent Highway 3 bridge structure.

This marks one of the final stages of the project, with crews now focused on wrapping up the remaining work through the corridor.

A lot of planning, coordination and hard work went into reaching this point. Great work by everyone involved in getting the new bridge open safely and keeping the project moving toward completion.




๐Ÿšง We are hiring Construction Labourers! Join Our Crew ๐ŸšงJakes Construction is looking for Construction Labourers to join ...
08/28/2026

๐Ÿšง We are hiring Construction Labourers! Join Our Crew ๐Ÿšง

Jakes Construction is looking for Construction Labourers to join our civil construction team!

This is a hands-on role suited for someone who is reliable, physically able, and comfortable working outdoors in all weather conditions. The successful candidate will support our crews with general site labour, material handling, and other tasks on active civil construction projects.

Weโ€™re looking for:
โ€ข Someone who is reliable, safety-conscious, and ready for hands-on work
โ€ข A willingness to learn, take direction, and work as part of a crew
โ€ข Ability to meet the physical demands of civil construction work
โ€ข A valid driverโ€™s licence and reliable transportation

What Youโ€™ll Get:
โ€ข Competitive Pay
โ€ข Hands-On Training
โ€ข Supportive Crew Culture
โ€ข Growth Opportunities

Interested in joining our team? Apply through the Indeed link below or send your resume to [email protected]!

https://ca.indeed.com/job/civil-construction-labourer-b7d87136c71767f1

Throwback Thursday ๐ŸšงTaking a look back at work on Nicomen Island, where protecting the surrounding environment was just ...
08/27/2026

Throwback Thursday ๐Ÿšง

Taking a look back at work on Nicomen Island, where protecting the surrounding environment was just as important as strengthening the d**e itself.

Crews were working through challenging ground conditions and environmental requirements while improving flood protection infrastructure for the area.

The work was careful, measured and very site-specific - all with the bigger picture in mind: protecting the surrounding community and landscape for years to come.

08/10/2026

Meet our new addition to the lineup.

Our drain tile machine allows crews to install agricultural drainage more efficiently and with greater accuracy. Properly placed drain tile helps move excess water, improve ground conditions and support stronger crop performance over time.





โ›ณ๏ธ ๐—”๐—ป๐—ผ๐˜๐—ต๐—ฒ๐—ฟ ๐—”๐—ป๐—ป๐˜‚๐—ฎ๐—น ๐—ž๐—น๐—ฎ๐—ฎ๐˜€๐˜€๐—ฒ๐—ป ๐—š๐—ฟ๐—ผ๐˜‚๐—ฝ ๐—š๐—ผ๐—น๐—ณ ๐—ง๐—ผ๐˜‚๐—ฟ๐—ป๐—ฎ๐—บ๐—ฒ๐—ป๐˜ ๐—ถ๐˜€ ๐—ถ๐—ป ๐˜๐—ต๐—ฒ ๐—ฏ๐—ผ๐—ผ๐—ธ๐˜€! โ›ณ๏ธ We had an incredible turnout, perfect weather, fun ...
07/16/2026

โ›ณ๏ธ ๐—”๐—ป๐—ผ๐˜๐—ต๐—ฒ๐—ฟ ๐—”๐—ป๐—ป๐˜‚๐—ฎ๐—น ๐—ž๐—น๐—ฎ๐—ฎ๐˜€๐˜€๐—ฒ๐—ป ๐—š๐—ฟ๐—ผ๐˜‚๐—ฝ ๐—š๐—ผ๐—น๐—ณ ๐—ง๐—ผ๐˜‚๐—ฟ๐—ป๐—ฎ๐—บ๐—ฒ๐—ป๐˜ ๐—ถ๐˜€ ๐—ถ๐—ป ๐˜๐—ต๐—ฒ ๐—ฏ๐—ผ๐—ผ๐—ธ๐˜€! โ›ณ๏ธ

We had an incredible turnout, perfect weather, fun games, a little friendly competition, and plenty of laughs from the first tee to the final putt.

Whether it was chasing the longest drive, sinking a clutch putt, or taking on one of the many challenges around the course, there was no shortage of memorable moments. And let's just say... one of the water hazards got a little more attention than it usually does. ๐Ÿ›ถ

A huge congratulations to all of our tournament winners, and thank you to everyone who came out and made another great tournament possible. Days like these are a great reminder of the team and culture we've built together.

Thanks to everyone who came out and made another great day even better. We'll see you on the course next year! โ›ณ

Thereโ€™s often more involved in road rehabilitation than whatโ€™s visible once the work is done. ๐ŸชจFrom earthworks and large...
06/09/2026

Thereโ€™s often more involved in road rehabilitation than whatโ€™s visible once the work is done. ๐Ÿชจ

From earthworks and large riprap placement to culvert installations and roadway reconstruction, this type of work focuses on stabilizing the corridor and rebuilding key components that support long-term use. Projects like this require coordination across multiple crews and disciplines, often in constrained environments.

๐—ฃ๐—ฟ๐—ผ๐—ท๐—ฒ๐—ฐ๐˜ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ: ๐—™๐—ฟ๐—ฎ๐˜€๐—ฒ๐—ฟ ๐—›๐—ถ๐—ด๐—ต๐˜„๐—ฎ๐˜† ๐—ฃ๐—ฟ๐—ฒ๐—น๐—ผ๐—ฎ๐—ฑ ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป Work is well underway on the preload on the site of the future South...
05/29/2026

๐—ฃ๐—ฟ๐—ผ๐—ท๐—ฒ๐—ฐ๐˜ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ: ๐—™๐—ฟ๐—ฎ๐˜€๐—ฒ๐—ฟ ๐—›๐—ถ๐—ด๐—ต๐˜„๐—ฎ๐˜† ๐—ฃ๐—ฟ๐—ฒ๐—น๐—ผ๐—ฎ๐—ฑ ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป

Work is well underway on the preload on the site of the future South of Fraser Maintenance and Storage Facility.

To date, efforts have focused on ground preparation and improvement across challenging conditions, including peat excavation, preload placement, wick drain installation and ongoing settlement monitoring.

With significant volumes of material moved, crews on site continue to put in a strong effort as work progresses through this phase of the project.

Address

44097 Progress Way
Chilliwack, BC
V2R0W3

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm

Telephone

+16047025699

Alerts

Be the first to know and let us send you an email when Jakes Construction Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share