10/18/2026
A fresh start for these elementary school washrooms! ๐ซโจ
After tile removal left the concrete damaged, we restored the surface with an epoxy skim coat, applied a moisture vapour barrier, and added coving in selected areas before finishing with an epoxy flake system.
From the preparation to the final detailsโa durable, easy-to-clean floor ready for busy school days. ๐ช
SchoolRenovation BCContractors