Canyon Spring Homes

Canyon Spring Homes Check out our website!!! http://www.canyonspringhomes.com

A good day at 1215! 🙌The concrete floor and garage are officially poured, and it’s always exciting to see another big st...
09/01/2026

A good day at 1215! 🙌

The concrete floor and garage are officially poured, and it’s always exciting to see another big step take shape on site.

The roof at 723 is looking incredible! You may have noticed this home sat for a little while before construction continu...
08/30/2026

The roof at 723 is looking incredible!

You may have noticed this home sat for a little while before construction continued and there was a very good reason. The homeowners chose a custom metal roofing product designed to look just like traditional shingles, and it was absolutely worth the wait!

This beautiful roofing gives the home the classic look of shingles while offering the durability and longevity of metal roofing. It’s a product that’s built to last for many, many years.

While we waited for the roofing to arrive, we made the decision not to move forward with the interior construction until the home was completely watertight. Protecting the home and the work that goes into it is always more important than rushing the process.

Sometimes custom takes a little longer but when it turns out like this, it’s easy to see why it’s worth the wait.

08/22/2026

Rough-ins are underway at 1109!

Plumbing, HVAC, and electrical work are bringing all the important behind-the-walls details together as this home keeps moving forward.

08/21/2026

Join our Construction Manager, Blake, as he shows us what’s been happening on site and takes a closer look at 1108!

Video 2/2

08/21/2026

Join our Construction Manager, Blake, as he shows us what’s been happening on site and takes a closer look at 1108!

Video 1/2

The footings have been poured at 1228, creating the foundation for everything to come.Next step is foundation walls!
08/20/2026

The footings have been poured at 1228, creating the foundation for everything to come.

Next step is foundation walls!

08/18/2026

Big progress at 1215!

Framing is officially complete, the windows and doors are installed, and rough-ins are well underway. HVAC and plumbing are finished, with electrical coming up next.

This is such an exciting stage of the build because so much is happening both inside the walls and throughout the home.
the structure enclosed and the mechanical work moving along, 1215 is really starting to come together!

08/15/2026

We’re getting closer to possession at 814!

The exterior of the garage is complete, and inside, the lighting and ceiling fans have been installed. These finishing details are really bringing everything together and making the home feel more complete every day.

Not much longer now until 814 is ready to welcome its homeowners!

08/13/2026

Lots of progress happening at 724!

Siding installation is underway on the exterior, while inside, priming has begun as work continues throughout the home.

There’s something pretty special about having family be part of the building process. ❤️During this homeowner’s electric...
08/12/2026

There’s something pretty special about having family be part of the building process. ❤️

During this homeowner’s electrical walk-through, her kids came from as far as Vancouver to walk through the home with their mom.

A new home is about so much more than the walls going up, it’s about the people who will gather there and the memories that will be made inside. We love getting to see families share these moments together.

Address

11379/174 Street NW
Edmonton, AB
T5S0B7

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm

Telephone

+17804873056

Alerts

Be the first to know and let us send you an email when Canyon Spring Homes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Canyon Spring Homes:

Shortcuts

Share

Category