How Does an Onsite Sewerage (Septic) System Project Work?
Many property owners are surprised to learn that installing or replacing an onsite sewerage system involves much more than excavation. A properly designed system follows a structured process from site investigation through final certification.
The infographic below summarizes the typical project sequence in British Columbia:
• Site investigation and soil assessment
• System design by an Authorized Person
• Filing the design with the local Health Authority
• Installation in accordance with the filed design
• Construction supervision by the Authorized Person
• Letter of Certification following completion
Property owners generally have two options:
1. Turnkey Project** – One contractor coordinates both the design and installation.
2. Owner-Managed Project** – The owner engages an Authorized Person for the design and Health Authority filing, then selects an installation contractor.
Understanding the process helps property owners make informed decisions before construction begins.
Infographic below is explaining the typical process for designing, installing and certifying an onsite sewerage system in British Columbia.