03/05/2025
S.E.M. Construction has successfully completed an extensive $15,000,000 renovation of the Chemotherapy and Pharmacy Departments at Stratford General Hospital. The project encompassed the transformation of approximately 18,000 square feet of operational hospital space across multiple floors. This significant upgrade enhances the historic facility’s capabilities, enabling it to better support and treat patients during their most vulnerable moments.
The 3rd floor renovations included upgrades to Architecture, Electrical, and HVAC systems to create office spaces for staff. Architectural changes added new ceilings, vinyl flooring, windows, and paint. Electrical upgrades included new wiring, panels, and light fixtures. HVAC improvements provided heating and cooling with new radiators, thermostats, and ductwork. On the 4th floor, new wall assemblies and Electrical and HVAC systems were added in the 300 and 400 blocks of the West wing.
A new Pharmacy was built in the 300 block, featuring a secure narcotics room, compounding rooms, fume hoods, biosafety cabinets, HEPA filtered chambers, and office areas. Additionally, a Chemotherapy treatment space in the 400 block now has treatment rooms, a pressurized ANTE and Isolation room, nurse stations, and reception areas. In addition, all roofing within blocks 300 & 400 were replaced; and the overall HVAC system was upgraded with two new 10,000CFM air handling units.
S.E.M. Construction is proud to have led this project as the General Contractor, reinforcing our leadership in the institutional healthcare sector. The complexities and lasting impacts of this project highlight our commitment to excellence.
Client:
Architect & Prime Consultant: .inc
Structural & MEP:
Owner’s Representative:
Photo’s by: