10/08/2026
Customer called us after dealing with constant drainage issues. After scoping the lines, we found severe scaling and cracking throughout the old cast iron drain system.
Since the floors were already being opened up to fix the damaged cast iron it was the perfect time to take care of roughing in the new bathroom layout at the same time!
Everything is now ready for the next phase. Can’t wait to see this bathroom come together once we’re back to install the fixtures! 🔧