Bayview Builders

Bayview Builders Design and build. Renovations to single family homes, condominiums, and Muskoka lake houses.

Food and drinks are amazing in Zurich but you have to understand it is really expensive. We went to the Lindt chocolate ...
06/17/2024

Food and drinks are amazing in Zurich but you have to understand it is really expensive. We went to the Lindt chocolate factory and we ate about a pound of chocolate each. Leaving early tomorrow for Budapest.

06/17/2024

We have 4 projects underway. One 1632 sq ft condominium we were able to fully renovate so the owners can move furniture in just 6 weeks. Fully done except we are waiting for delivery of the kitchen, vanities, and built ins. The client typically takes time to make decisions on design of cabinets. So this takes longer than my renovation process. 6 weeks from old to new.

Three projects underway. Two condominiums and a house. These pictures show what I believe is the best way to do crown mo...
05/17/2024

Three projects underway. Two condominiums and a house. These pictures show what I believe is the best way to do crown molding when you have a concrete ceiling.

We removed the old ceiling and raised the new one to make the kitchen feel more spacious
05/12/2024

We removed the old ceiling and raised the new one to make the kitchen feel more spacious

Another 2000 sq ft renovation completed in record time.
02/16/2024

Another 2000 sq ft renovation completed in record time.

02/16/2024
Very small little things to be done but the 2000 sq foot condominium is ready to move in with only 10 weeks of work. Thi...
02/09/2024

Very small little things to be done but the 2000 sq foot condominium is ready to move in with only 10 weeks of work. This was a complete renovation nothing stayed everything is new. If you want a high quality renovation completed quickly and efficiently at a reasonable cost give me a call

Week 9 and we are almost done. Monday the plumbers will install all showers, tub, sinks, washer, dishwasher etc. The ele...
01/27/2024

Week 9 and we are almost done. Monday the plumbers will install all showers, tub, sinks, washer, dishwasher etc. The electrician will install all the switch covers and lighting. Tuesday the door k***s will be installed. Then the cleaners do a major cleaning of everything including windows and screens. Ready for move in by Thursday.

This is week 8. All cabinets have handles, countertops and LED lighting. Shower glass doors are installed. Fine filling,...
01/24/2024

This is week 8. All cabinets have handles, countertops and LED lighting. Shower glass doors are installed. Fine filling, sanding and priming of all walls and trim now complete. Condo buildings built 40 years ago had very wavy ceilings, floors, and walls. We have spent a lot of time fixing most of these issues. At least 5 extra days making everything right. Many thanks to Niko Painting great job. Also my cabinet maker Perola Kitchens. Another amazing job. This week we finish painting and then a big clean up so electrical and plumbing can come in to finish next week.

Week 6. The cabinets are done just the door handles to go. All the tiles are done waiting for the shower wall and doors ...
01/07/2024

Week 6. The cabinets are done just the door handles to go. All the tiles are done waiting for the shower wall and doors which are coming soon. The site while be exclusively for the painter over the next two weeks. The original walls are not finished very well so we are spending a fair bit of time improving the taping so the walls will be flat and smooth. The carpentry is amazing you can’t see any of the joints.

Week 5  has been productive. Most of the Kitchen, dinning room, master bedroom cabinets are partially installed. As are ...
01/01/2024

Week 5 has been productive. Most of the Kitchen, dinning room, master bedroom cabinets are partially installed. As are the master and guest bathroom cabinets. The painter has all of the floors covered in waterproof paper so the new floors stay pristine. Nobody is working between Christmas and New Years. Week 6 will be another busy time as we finish the tiling and cabinets.

Address

Oakville, ON
L6(H,J,K,L,M)

Website

Alerts

Be the first to know and let us send you an email when Bayview Builders posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Bayview Builders:

Share

Category