05/05/2026
Some progress shots from Our St.John’s church project in Oakville.
Photo 1: The current state of the repointing very faded but still intact considering the age of this church.
Photo 2: Preparing the joints appropriately. Standard for repointing are what ever the mortar joint is you removed twice that as the depth minimum. This allows for new material to hold onto the older material left over.
Photo 3: A red stopping mortar is applied with a channel cut in each joint. Lime putty is then applied to reinvigorate the arch bringing it back to its former self.