This new dock and boathouse is hiding something extraordinary...
Built into a site with an approximately 200 foot underwater bedrock cliff, this cantilevered boathouse demanded far more than a standard waterfront steel pile dock foundation. Oversized piles along the bedrock shelf, deep water drilling and pinning, bracing hidden in the walls, floor and underwater, tie backs at the dock and upper floor levels.
The result is a structure that sits effortlessly over the water, while the real structure is hidden beneath the surface of the water and walls.
We are problem solvers, big or small we do it all. Bring us your unique Muskoka challenges.
[Muskoka engineering] [boathouse engineering] [cantilevered boathouse] [waterfront engineering] [structural engineering] [dock engineering] [steel pile foundation] [deep water drilling] [bedrock foundation] [Muskoka boathouse] [waterfront construction] [Lake Muskoka] [custom boathouse design] [cottage engineering] [de Koning Group]