09/02/2026
💲💲$425,000 in estimated annual savings.💲💲
The City of Saskatoon took a new approach to curb stop replacements — and the results are worth a look.
Smaller excavation. Less restoration. Less time on site.
We broke down the City’s reported results and EasyDig’s role in the process in our latest case study.
Read the full case study 👇
City of Saskatoon Curb Stop Case Study | EasyDig — EasyTech Infrastructure Group https://zurl.co/ntxYn