Fast Cool HVAC

Fast Cool HVAC πŸ”§ HVAC Experts | Since 2007
🏠 Heat Pump & HVAC Installations
πŸ’° York Dealer + Extra Rebates

πŸ“ž Call now for a free HVAC consult

05/26/2026

Communication is a big part of how we run jobs.

When everyone on site is on the same page, the work moves cleaner and the result holds up.

Exhaust ducting mounted up and ready for the next stage.
05/25/2026

Exhaust ducting mounted up and ready for the next stage.

Rooftop scope check before the next phase kicks off.
05/18/2026

Rooftop scope check before the next phase kicks off.

05/14/2026

Not every take makes the cut. Karan keeping it real on site.

05/12/2026

Recently wrapped a dual fuel system install at this property.

Thinking about a dual fuel system? Send us a message and we'll walk you through the rebate.

05/11/2026

Upgrading to meet rebate requirements is not just about compliance, it is about building a system that actually performs efficiently long term, and this dual fuel setup with a heat pump and hydronic backup does exactly that.

Watch how this system works.

Ready to run.
05/11/2026

Ready to run.

05/05/2026

This system is up and running with the heat pump and hydronic backup fully dialed in, and now it is just about finishing the small details before handover.

Watch how everything comes together in the mechanical closet.

Walking the drawings on site before anything gets installed.
05/04/2026

Walking the drawings on site before anything gets installed.

Lining everything up.
04/20/2026

Lining everything up.

04/16/2026

Most HVAC issues don’t start on site, they start in the drawings. We spend time reviewing both mechanical and architectural plans together so we can catch things early, like line lengths that would push a heat pump past its limits, and redesign the layout to make it work better for the building.

On this project we rerouted the refrigeration lines and centralized the units on the rooftop, which opened up the patios and made the space more usable for the developer.

This kind of planning upfront saves time, cost, and a lot of headaches later.

Address

3211 152 Street Building C Unit #459
Surrey, BC
V3S3M1

Alerts

Be the first to know and let us send you an email when Fast Cool HVAC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fast Cool HVAC:

Share