08/17/2026
Before & After
A project we recently wrapped up that kept us busy while we were rained out on our main project.
We built a flat pad off the existing shop to allow them to extend their shop and dug a drainage ditch to the back. We also built up the road and driveway to help keep water away from the house and shop.