K-Vans Construction *Kitchens *Bathrooms *Roofing *Siding *Decks *Garages *Windows/Doors and much more. Over 18 years of experience. One of our main priorities is safety.

Another priority is to meet our customers expectations of their renovations.

Before and After: A New House on the Block. This project involved removing and installing a new front door, removing all...
10/17/2026

Before and After: A New House on the Block. This project involved removing and installing a new front door, removing all existing shutters and siding, installing new house wrap and installing new vinyl siding.
We also added a new front step.

We have two sides left to finish on this project.

Stay tuned for the new house on the block. We are very grateful for every opportunity we receive, to help clients transf...
10/10/2026

Stay tuned for the new house on the block.
We are very grateful for every opportunity we receive, to help clients transform their homes.

Where two garages come together.Three feet higher than the front part.
10/10/2026

Where two garages come together.
Three feet higher than the front part.

10/07/2026

The interesting things you discover during renovations.

Before and after.Front door replacement.
10/07/2026

Before and after.
Front door replacement.

This project involves the complete construction of a garage add-on. We were contacted by repeat clients, for whom we had...
09/30/2026

This project involves the complete construction of a garage add-on. We were contacted by repeat clients, for whom we had previously built a deck and gazebo at the rear of their residence, to construct this additional 20 ft by 28 ft garage.

09/25/2026

The installation of the garage door is complete, and it is now fully operational.

Everything is prepared for the electrical work; after that is completed, we will proceed with insulation, v***r barrier ...
09/20/2026

Everything is prepared for the electrical work; after that is completed, we will proceed with insulation, v***r barrier installation, and covering with OSB.

The steel roof has been installed. Soffit and siding will be next, followed by the garage door. After that, we will move...
09/20/2026

The steel roof has been installed. Soffit and siding will be next, followed by the garage door. After that, we will move to the interior to enclose the structure.

It is nearly time to finalize the roof construction.
09/15/2026

It is nearly time to finalize the roof construction.

Address

Amherst, NS
B4H

Website

Alerts

Be the first to know and let us send you an email when K-Vans Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to K-Vans Construction:

Shortcuts

Share

Category