09/02/2026
The lowest quote is the most expensive one you'll ever accept. You just don't find out until the wall is already open.
Here's how it goes. You get three quotes. One is noticeably cheaper, and the person seems nice, so you go with your gut. Deposit paid. Demolition day arrives. And two days in, you get the phone call every homeowner learns to dread.
"So, we opened up the wall, and we found something."
Now there's rot, or old wiring, or a plumbing problem, or a structural surprise. It'll be extra. A lot extra. And here's the part that makes your stomach drop. You can't say no. The wall is open. The project is halfway torn apart. Your home is a construction site your dog is trying to sleep in. You have zero leverage, and the person quoting the "extra" knows it.
That is not bad luck. For a certain kind of contractor, it is the business model. Quote low to win the job, find the "surprise" after you're committed, and bill it back when you can't walk away.
Here's how it should work instead. Before you ever sign, we investigate the bones of the house. Structure, wiring, plumbing, the things older homes hide. Whatever is back there gets found and priced while you can still make a free choice, not after you're trapped. Then the price is fixed. What we find gets priced in writing before demolition, so there is no dreaded phone call, because there is nothing left to discover.
The cheapest quote wins the job. The honest one wins your trust and finishes on budget.
Book at https://www.frontierbuildinggroup.com/ or call us at 519.448.3946. We actually pick up.
Proudly serving Waterford, Brantford, Paris, Simcoe, Brant County, Haldimand County, Norfolk County, Ohsweken, and Six Nations.
Tag a pet owner about to start a reno. Save them the phone call.