JWHConstruction

JWHConstruction Small Owner Operated Construction company. I take pride in making sure every project is done right!

Small basement renovation. Complete with new plumbing for a basement bathroom and a back water valve. Just before the ca...
12/07/2019

Small basement renovation. Complete with new plumbing for a basement bathroom and a back water valve. Just before the carpet went in we discovered a leak in the foundation. I had my guys dig and seal the south foundation wall, luckily we found this before the carpet went in. Turned out great.

2nd storey and 4th car garage addition. Over 1400 sq ft of extra space. Vaulted ceilings, round windows and lots of pink...
11/23/2019

2nd storey and 4th car garage addition. Over 1400 sq ft of extra space. Vaulted ceilings, round windows and lots of pink. My crew and I did all of the work from the ground up.

Custom built in bookshelf, turned out great.
11/23/2019

Custom built in bookshelf, turned out great.

2 days to build and wrap this double oversized garage in St. Malo.
11/23/2019

2 days to build and wrap this double oversized garage in St. Malo.

I would always recommend this product when doing a tile tub surround or custom shower. It makes sure your shower are com...
05/27/2017

I would always recommend this product when doing a tile tub surround or custom shower. It makes sure your shower are completely waterproof and does not add much to the over cost. Read more here: https://www.schluter.ca/schluter-ca/en_CA/Shower-System/Waterproofing/c/SS-W

Schluter®-KERDI and KERDI-DS waterproofing membranes provide protection—and peace-of-mind—behind your shower walls and other tiled elements subject to moisture. KERDI and KERDI-DS are pliable, sheet-applied, bonded waterproof membranes and v***r retarders with limited crack-bridging capabilities. Ac...

Small bathroom renovation. Some unexpected items. The customer decided to get a cast iron tub, which weighs about 350lbs...
05/26/2017

Small bathroom renovation. Some unexpected items. The customer decided to get a cast iron tub, which weighs about 350lbs without water. Called my engineer to see if their floor would support it. It turns out it wouldn't over time so I reinforced the floor joists. The tub was bigger than the previous tub so I have to move the main stack. Every problem has a solution. It turned out great.

Basement renovation, turned into more of a lounge than a basement.
05/26/2017

Basement renovation, turned into more of a lounge than a basement.

Address

9 Bernier Bay
Winnipeg, MB
R2J2B3

Alerts

Be the first to know and let us send you an email when JWHConstruction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share