Carpi Tech

Carpi Tech Waterproofing specialists and contractors with geomembranes since 1963 with area of activity all around the globe..

Carpi has the longest and largest record in the world for geomembranes installations in hydraulic structures, with geomembranes systems on 135+ large dams, 50+ canals and hydraulic tunnels, 30+ reservoirs. Carpi holds all world records for installation of geomembranes systems on high dams: Bovilla rockfill dam, 91 m, highest rockfill dam with a geomembranes as only waterproofing element, Miel I RC

C dam, 188 m, Alpe Gera concrete gravity dam, 174 m, Lost Creek arch dam, first underwater installation of a geomembrane system on a dam. Carpi geomembranes and geomembranes systems have been validated among others by the U.S. Army Corps of Engineers (USACE), Hydro Québec, and ICOLD, the International Commission on Large Dams. Carpi has experience both as main contractor managing the entire project and as specialist sub-contractor. Carpi’s typical customers are owners and consulting engineers who require investigation and advice to correct leakage or infiltration problems. In 50 years of activity Carpi has completed projects worldwide, in environments ranging from mountainous regions and northern countries to equatorial, tropical and desert regions, from the Alps to the Equator.

Canton Weir, located in Canton, Oklahoma, was successfully completed at the end of last week. Carpi added an external wa...
31/05/2016

Canton Weir, located in Canton, Oklahoma, was successfully completed at the end of last week. Carpi added an external waterstop in ten locations

Hume Lake Dam, California, USA - finished !!!
11/03/2016

Hume Lake Dam, California, USA - finished !!!

Last roll of membrane installed at Hume Lake Dam today... But as you can see we are not finished yet ;-)
24/02/2016

Last roll of membrane installed at Hume Lake Dam today... But as you can see we are not finished yet ;-)

2016 marks 20 years since the completion of Bouillouse 1.  Bouillouse 1 is a gravity/masonry dam and the geomembrane sys...
11/01/2016

2016 marks 20 years since the completion of Bouillouse 1. Bouillouse 1 is a gravity/masonry dam and the geomembrane system is still performing after being installed in 1996.

Snow Man on the watch for trespassers... :-D
07/01/2016

Snow Man on the watch for trespassers... :-D

Great progress at Hume
04/01/2016

Great progress at Hume

It's been about a month, since we finished lining of Camporredondo dam - over 60m tall masonry dam in Spain. Our crew ha...
23/12/2015

It's been about a month, since we finished lining of Camporredondo dam - over 60m tall masonry dam in Spain. Our crew had to face some harsh weather conditions there, including floods that few times during installation drowned the lowest compartment area around the intake structure...

...not too shabby, ha? ;-)
12/12/2015

...not too shabby, ha? ;-)

Hume Lake Dam, located in Sequoia National Park, CaliforniaCarpi USA crew is making great progress on the multiple arch ...
11/12/2015

Hume Lake Dam, located in Sequoia National Park, California
Carpi USA crew is making great progress on the multiple arch dam

Carpi Tech will be  2015 Conference, in Brisbane, Australia, 4-8 November 2015. Stand N. 8.
20/10/2015

Carpi Tech will be 2015 Conference, in Brisbane, Australia, 4-8 November 2015. Stand N. 8.

Carpi Tech will be @ Hydro 2015 Conference and Exhibition, in Bordeaux, France, 26-28 October 2015. Stand 57.
13/10/2015

Carpi Tech will be @ Hydro 2015 Conference and Exhibition, in Bordeaux, France, 26-28 October 2015. Stand 57.

Adresse

Via Passeggiata 1
Balerna
6828

Benachrichtigungen

Lassen Sie sich von uns eine E-Mail senden und seien Sie der erste der Neuigkeiten und Aktionen von Carpi Tech erfährt. Ihre E-Mail-Adresse wird nicht für andere Zwecke verwendet und Sie können sich jederzeit abmelden.

Teilen