18/06/2026
Ask an Ammann Engineer❓
What’s more efficient: transporting asphalt - or moving the plant? 💡
In countries with large distances between construction sites, logistics play a major role in project efficiency.
Mobile asphalt plants, such as the Ammann Prime 2.0, are designed to bring production closer to the jobsite - reducing transport distances, saving time and improving overall project flexibility.
In this episode of 'Ask an Ammann Engineer', Marcos Henz, Process Analyst at Ammann Brazil 🇧🇷, explains why solutions like the Ammann Prime are designed for exactly these scenarios.
👉 Watch the video to learn more.