2026/10/24
50 𝙠𝙒 / 100 𝙠𝙒𝙝 𝙀𝙎𝙎 𝙪𝙣𝙞𝙩𝙨 𝙖𝙧𝙚 𝙜𝙚𝙩𝙩𝙞𝙣𝙜 𝙧𝙚𝙖𝙙𝙮 𝙛𝙤𝙧 𝘼𝙛𝙧𝙞𝙘𝙖. 🌍
Factory Acceptance Testing (FAT) is complete for this batch of AMP NOVA commercial energy storage systems. We are now preparing the units for shipment to Africa.
Good to see these cabinets lined up on the factory floor after the work that has gone into production and testing.
It also brings us back to a practical question behind every ESS project:
How will the system be used at the customer’s site?
Power and energy capacity are the starting point. Understanding the actual application means looking at a few more details:
• Which loads need to be supported?
• How does demand change throughout the day?
• What operating schedule does the customer expect?
• What installation conditions need to be considered?
These questions help connect equipment specifications with project requirements.
Thank you to our team for the work behind this batch. Looking forward to the next stage of delivery.
For installers and EPC teams: what information do you always ask a customer for before recommending an ESS?