02/09/2018
تعلن شركة بتروأليكس للتدريب و الحلول الهندسية عن بدء دورة بريمافيرا بسعر رمزى جدا # 15 جنيها للمحاضرة وتفاصيل الدورة كالأتى:
• مدة الدورة : 30 ساعة
• المحاضرات : أيام السبت والأحد من كل أسبوع
• إجمالي عدد محاضرات الكورس 10 محاضرات
• المحاضر: م/ احمد الجنايني
• يشترط إحضار اللاب توب الشخصي لكل متدرب
Course Outline:
=============
1. Introduction:
Introduction for Management usage, Tools and Skills.
Projects Phases.
Projects Scope.
How to choose your project (Feasibility studies Techniques).
Cash Flow.
Break-Even Point.
Project Planning Programs.
Set Up Primavera P6.
Requirements for create a new project.
Create & Explain Enterprise Project Structure EPS.
Create & Explain Organization Break Down Structure OBS
Assign OBS & EPS..
1. Creating New Project:
Relations between Activities & Critical Path Method.
Different Between CP & PERT Methods.
Differentiate between early and late dates for activities
Understand lag, lead, free float and total float
Create a new Project.
Determine Planned Date & Data Date
2. Creating Calendars:
Creating Calendars.
Determining Working hours.
How to use Calendar and More than Calendar on Project.
Change Calendars (3 Ways For Changing).
Different Between Global, Resource and Project Calendars.
3. Creating Work breakdown structure (WBS):
What Is the WBS
How to Get WBS for Project & How to create new one.
How to Create a new Activities.
Describe activity (ID, Name, Type, and Code).
Add activities and Estimate duration (Activity List).
Define activity types.
Copy and paste activities.
Add notebook topic and description on Activities.
Explain how to attach document or drawing for activity.
Explain work product and document.
View and discuss Activity details tabs.
2. Creating Relationships between activities:
Create Activity Network diagram (Manual & on Primavera).
Assign successor and predecessors (relationship)
Gantt chart and its Properties.
Creating a project (EPS – OBS – Calendar – WBS – Activities 2 – Activities and Projects Codes:
Assign codes on activities and Project.
Getting Codes on Charts and using View Tab.
Use Multi selection for activities to assign codes& Techniques of using Primavera. 3 - Filter for activities:
Create filters & Filters Type.
Explain group and sort tool and its option.
4. Formatting project data:
Time scale format.
Bars format and bars options.
5.Project Baseline:
What is the base Line?
Baseline Usages.
Create a baseline.
1.Layouts:
Open Layout.
Save Layout.
Exporting / Importing Layouts.
2. Pert Method:
Approximation methods (Pert).
Usages of Normal Distribution.
Crystal Ball Usages (Excel Application).
Normal Distribution & Multiple Distribution (Excel & Minitab).
3. Introduction on Resources:
Introduction on Resources.
Relations of Resources.
Determine Resource type labor, Non-Labor, Material.
1. Assign Resources:
Explain performance rates and calculate resource unit.
Differentiate between self-work and subcontractor resource.
Explain Duration Types and its effect.
Add Expenses to Activities.
Assign resource curve.
Explain Activity Usage Spread Sheet.
Explain Activity Usage Profile (Project S-Curve).
2. Project resource distribution plan and leveling:
What is the leveling.
Manual Example on Leveling.
Make Leveling by Excel.
Leveling on Primavera.
Explain resource leveling options.
1. Project Control:
Schedule Compare Technique SV
Cost Comparing Techniques CV
Manual Example on Sv & CV.
2.Professional Certifications
للحجز و الإستعلام : 01005050743 / 01033094112/ 01278483544/ 035447290
العنوان : 306 شارع أبو قير أمام كوبرى كيلوبترا/ الأسكندرية