26/06/2022
1.Repair Buffer bin Bottom and 2 m height
-change the old sheet
-Fabricate and Supply new sheets with the correct dimensions mentioned in the drawings
-install by welding the sheets
2.Repair Chain casing by 5cm patch KSD2
3.Change Chain upper railway KSD2
4.Change the chain completely with buckets