17/09/2026
THE SOUND OF INDUSTRIALIZATION
What does industrialized construction sound like?
For L31, the CLT structure was assembled in just three days, within the narrow streets of a Mediterranean historic town.
A precisely designed and prefabricated system transforms not only the way we build, but also the impact of construction on its surroundings.
Less noise.
Less waste.
Less disruption.
In a context where everyday life continues just a few metres from the building site, silence becomes another form of sustainability.
L31 · Benalmádena, Spain
CLT · Ensambla Madergia
Assembly · IN-EX
Logistics · Grúas Casado