THH Electrical

THH Electrical Domestic / Commercial Electrician

After a little water damage. I had the opportunity to fit ’ new 3phase SPD DB.-Upgraded the supply from 10mm 4Core - 25m...
01/12/2023

After a little water damage. I had the opportunity to fit ’ new 3phase SPD DB.

-

Upgraded the supply from 10mm 4Core - 25mm 5C. New 3phase 100A fused Isolator at the origin. RCBO on each circuit bringing everything up to 18th Edition.

-

Inspection identified that some cables sized were too small for their circuit protection so protective devices downsized for them circuits.

-

⚡️

Been quiet on here due to being super busy. But here’s a consumer unit from a 2nd fix these last few days. - 10 way SPD ...
03/11/2023

Been quiet on here due to being super busy. But here’s a consumer unit from a 2nd fix these last few days.


- 10 way SPD ☑️
- Din rail entry ☑️
- Fire retardant board / Fire retardant grommet ☑️
- Mini RCBO’s ☑️
- CPC’s dressed first ☑️
- RCBO’s bootlace crimped ☑️
- All ready to liven each circuit as and when they are completed / tested ☑️

Thank you for the reviews, 2 in 1 week! Start as I mean to go on! ⚡️
15/09/2023

Thank you for the reviews, 2 in 1 week! Start as I mean to go on! ⚡️

Full or Partial rewires 🟢Kitchens 🟢Bathrooms 🟢Extensions 🟢Garage conversions 🟢Indoor / outdoor power and lighting 🟢Consu...
01/09/2023

Full or Partial rewires 🟢
Kitchens 🟢
Bathrooms 🟢
Extensions 🟢
Garage conversions 🟢
Indoor / outdoor power and lighting 🟢
Consumer unit changes 🟢

Free quotation ✅

✉️ 📥 : [email protected]

📞 : 07568 322100

1st fix now complete on Dale Street rewire.--Council came out this morning and approved everything. The other trades can...
01/09/2023

1st fix now complete on Dale Street rewire.

-

-

Council came out this morning and approved everything. The other trades can get in now and I’ll be back to 2nd fix and test everything at a later date.

-

-

One of this weeks jobs was getting Kitchen / Utility room ready for new Kitchen install.--Along with adding extra socket...
04/08/2023

One of this weeks jobs was getting Kitchen / Utility room ready for new Kitchen install.

-

-

Along with adding extra sockets, an outside light, and a new smoke detector circuit.

-

-

This was 1 half of a messy socket circuit in the kitchen, which failed Inspection and Testing (Zs value was the worst I’ve seen). So important to get your electrics routinely checked by a qualified electrician.

-

-

First stage of a full rewire completed. Got ahead of the game a little bit by running the circuits in and all drops done...
23/07/2023

First stage of a full rewire completed.



Got ahead of the game a little bit by running the circuits in and all drops done then tied up out the way so the builder can damp course.